Connecting up
4.2 Grounding
SCALANCE M826
Operating Instructions, 08/2018, C79000-G8976-C362-05
41
4.2
Grounding
A functional grounding must be established for example by connecting a cable from
terminal 5 to the DIN rail, refer to the section "Power supply (Page 45)“ or section “Terminals
(Page 23)“. Such a cable should be kept as short as possible.
If cables are installed permanently, it is advisable to remove the insulation of the shielded
cable and to establish contact on the shield/PE conductor bar.
Содержание SIMATIC NET SCALANCE M826
Страница 7: ...Preface SCALANCE M826 Operating Instructions 08 2018 C79000 G8976 C362 05 7 ...
Страница 8: ......
Страница 16: ...Security recommendations SCALANCE M826 16 Operating Instructions 08 2018 C79000 G8976 C362 05 ...
Страница 28: ......
Страница 37: ...Installation 3 6 Mounting on a pedestal SCALANCE M826 Operating Instructions 08 2018 C79000 G8976 C362 05 37 ...
Страница 38: ......
Страница 55: ...Connecting up 4 7 Replacing the PLUG SCALANCE M826 Operating Instructions 08 2018 C79000 G8976 C362 05 55 ...
Страница 56: ......
Страница 72: ...Approvals A 3 General approvals SCALANCE M826 72 Operating Instructions 08 2018 C79000 G8976 C362 05 ...
Страница 74: ...Index SCALANCE M826 74 Operating Instructions 08 2018 C79000 G8976 C362 05 ...