Installing and connecting the device
3.4 Switching on and testing the HMI device
Mobile Client900RXA
44
Operating Instructions, 07/2015, A5E36360099-AA
Result
The Loader appears again.
Note
When restarting the system, a project may already be loaded on the HMI device. The project
will then start after a configurable delay or when you press the "Start" button.
Use the relevant operating object to close the project.
Refer to your system documentation to find any additional information on this topic.
Function test
Perform a function test following commissioning. The HMI device is fully functional when one
of the following states is indicated:
●
The "Transfer" dialog appears.
●
The Loader is displayed.
●
A project is started.
Shutting down the HMI device
Close the project on the HMI device before shutting it down.
See also
Содержание SIMATIC Mobile Client900RFN
Страница 154: ...Abbreviations Mobile Client900RXA 154 Operating Instructions 07 2015 A5E36360099 AA ...
Страница 156: ...Glossary Mobile Client900RXA 156 Operating Instructions 07 2015 A5E36360099 AA ...
Страница 164: ...Index Mobile Client900RXA 164 Operating Instructions 07 2015 A5E36360099 AA ...