Assembling the M7-400
8-31
S7-400 and M7-400 Programmable Controllers Hardware and Installation
A5E00069481-04
OP 25
M7-400
M7-400 with
CPU as DP
master
ET 200M
S5-95U
ET 200B
RS 485
repeater
M7-400
M7-400
M7-400
OP 25
ET 200M
S5-95U
ET 200B
Terminating resistance switched on
* Only connected via spur line for startup/maintenance
PROFIBUS-DP
MPI subnet
S5-95U
ET 200B
ET 200B
subnet
Programming
device*
Figure 8-16
Example of a Configuration with the CPU in an MPI Subnet and PROFIBUS-DP Subnet
Содержание Simatic M7-400
Страница 10: ...Preface x S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 20: ...Contents xx S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 66: ...Installing the S7 400 2 40 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 74: ...Addressing the S7 400 3 8 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 118: ......
Страница 170: ...Starting Up 6 20 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 194: ...Maintenance 7 24 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 252: ...Assembling the M7 400 8 58 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 310: ...Glossary Glossary 18 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 316: ...Index Index 6 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...