Wiring the S7-400
4-37
S7-400 and M7-400 Programmable Controllers Hardware and Installation
A5E00069481-04
To plug in the front connector, follow the steps outlined below:
1. Hold the front connector horizontally and engage the front connector with the
coding key. After an audible click, the front connector will engage with the mount
and can be swung upwards.
2. Swing the front connector upwards. The two parts of the coding key will then be
separated.
3. Screw the front connector on.
Coding key
1
2
Figure 4-21
Attaching the Front Connector
Содержание Simatic M7-400
Страница 10: ...Preface x S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 20: ...Contents xx S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 66: ...Installing the S7 400 2 40 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 74: ...Addressing the S7 400 3 8 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 118: ......
Страница 170: ...Starting Up 6 20 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 194: ...Maintenance 7 24 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 252: ...Assembling the M7 400 8 58 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 310: ...Glossary Glossary 18 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 316: ...Index Index 6 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...