Manual, 08/2017, L1V30368969104A-02
139
Commissioning
8
The following content is described in this chapter:
●
Commissioning the 3KC4 transfer switching equipment
●
Commissioning the 3KC8 transfer switching equipment
8.1
Commissioning the 3KC4 transfer switching equipment
After the 3KC4 transfer switching equipment has been connected to the main circuits, and
the control circuits have been successfully connected according to type and source, you can
commission the transfer switching equipment.
Requirements
●
The transfer switching equipment is in the "Manual" position
Figure 8-1
Switch in "Manual" position
●
The handle is in the O position
Figure 8-2
Handle in the "O" position
Содержание SENTRON
Страница 1: ......
Страница 2: ......
Страница 10: ...Introduction 10 Manual 08 2017 L1V30368969104A 02 ...
Страница 12: ...General information 2 1 Certification 12 Manual 08 2017 L1V30368969104A 02 ...
Страница 20: ...Product information 3 1 Product description 20 Manual 08 2017 L1V30368969104A 02 3KC8 2000 A 2500 A 3200 A ...
Страница 24: ...Product information 3 2 Product family 24 Manual 08 2017 L1V30368969104A 02 ...
Страница 26: ...Functions 26 Manual 08 2017 L1V30368969104A 02 ...
Страница 138: ...Operation 7 4 Automatic mode programming of the electronic module 3KC8 only 138 Manual 08 2017 L1V30368969104A 02 ...
Страница 144: ...Commissioning 8 2 Commissioning the 3KC8 transfer switching equipment 144 Manual 08 2017 L1V30368969104A 02 ...
Страница 176: ...Accessories 9 18 Electronic module 3KC8 only 176 Manual 08 2017 L1V30368969104A 02 ...
Страница 182: ...Service and maintenance 10 2 Regular service and maintenance 182 Manual 08 2017 L1V30368969104A 02 ...
Страница 220: ...Appendix A 3 Storage conditions 220 Manual 08 2017 L1V30368969104A 02 ...