Siemens SENTRON Скачать руководство пользователя страница 12

10

l

 SEM3™ Metered Bus Plug for SENTRON Busway Systems

  How to "Ping" your SEM3 Controller: (Default IP address:  
 192.168.1.65)

  Open a Command Prompt and in the prompt type "ping"  
  followed by a space and the IP Address of the SEM3™ and press  
 

Enter

. (Do NOT type the quotation marks.)

  The following should appear in the prompt window:

    Pinging 192.168.1.65 with 32 bytes of data:
    Reply from 192.168.1.65: bytes=32 time=56ms TTL=250
    Reply from 192.168.1.65: bytes=32 time=60ms TTL=250
    Reply from 192.168.1.65: bytes=32 time=69ms TTL=250
    Reply from 192.168.1.65: bytes=32 time=78ms TTL=250
    Ping statistics for 192.168.1.65:
      Packets: Sent = 4, Received = 4, Lost = 0 (0% loss),
    Approximate round trip times in milli-seconds:
      Minimum = 56ms, Maximum = 78ms, Average = 65ms

  If not, then check your connection between the PC’s Ethernet  
  port and the Controller MODBUS TCP/IP port.

  Open a browser (such as Explorer, Chrome, etc.) and type the IP
   address 

192.168.1.65

 in the top window. Default user name

   is 

admin.

 Default password is 

SEM3

. User name and password  

  can be set to user preference and ARE case-sensitive. Default  
  login brings user in at Supervisor level so that all screens can be  
  seen and modified. It is recommended that user account(s) and  
  password(s)be set as soon as possible. 

  To reset user name and password navigate to the 

User Profile 

 

 page. 

7.2 Web User Interface

  For a detailed description on using the web user interface of  
  the SEM3™ product please refer to the 

SEM3™ User Manual

 or  

 

Quick Reference Guide

 found at 

www.usa.siemens.com/SEM3

.

7.3 Addressing the Meter Racks
 

SEM3™ meter racks are hard-coded with discrete addresses  

  that allow simultaneous module-to-controller communications.  
  Three and six meter racks have a rotary dial for adjusting  the  
  racks address range. All meter racks are shipped from the  
  factory with the rotary switch set to 0. Upon installation and  
  set-up the installer must adjust the rotary switch to uniquely  
  address each rack networked with a common controller. See  
  Table 1. The rotary switch is shown in Figure 10.

Figure 10: Six Pole Meter Module Rack with 10 Position Rotary  
Switch 

 

Note: 

Meter racks are internal to the bus plug. However, a view  

  port with rotary switch access hole allows the user to ensure  
  proper phasing of the meter modules and verify that they are  
  receiving power. The small hole over the rotary switch allows for  
  the rack to be addressed without opening the bus plug cover.  
  The location of the six meter rack is shown in Figure 11. It may  
  be necessary to remove the front cover of the plug to access and  
  adjust the rotary switch. Loosen the two thumb screws on the  
  bus plug cover to access the rack. 

 

DANGER: Ensure that breakers are in the OFF position before  

  removing the bus plug cover. Contact with live conductors  
  will result in serious injury or death.

   

Figure 11: Internal Location of Meter Module Rack In Metered  
Bus Plug

  Note that the internal layout of the bus plug is common for  
  metered and controller bus plugs. In either case, the rotary  
  switch must be adjusted to suit the network configuration. See  
  Table 1.

  Depending on the number of "daisy chained" bus plugs, three
   meter module rack rotary switches are set to one of the  
  following: 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E or F. Each  
  "daisy chained" meter module rack communicating with the
   same controller must be assigned a unique switch setting.  
  Similarly, six position racks are set to one of the following: 0, 1,  
  2, 3, 4, 5, 6, 7, 8 or 9. This is illustrated in Table 1.

  It is critical to note that there is an exclusivity condition for
   the six meter module racks. 

0

 and 

8

 cannot both be chosen

   as rotary switch settings for six position racks communicating  
  with the same controller. This is also the case for six position
  rack designations 

1

 and 

9

. This is because Modbus addresses  

  cannot be repeated when communicating with the same  
  controller.  See Table 1.

  If a combination of three and six meter plugs is required then
   the user must ensure that the corresponding Modbus addresses  
  are not repeated between the three and six meter racks. Also  
  remember that the maximum number of poles that the  
  controller can monitor is 45 (given cable length restrictions in  
  section 6.3). 

ROTARY SWITCH

Figure 11:

Internal Location of Meter Module Rack in Metered Bus Plug

METER

MODULE

RACK

Содержание SENTRON

Страница 1: ...SENTRON 3 6 Bus Plug with Optional SEM3 Package usa siemens com busway Installation Manual ...

Страница 2: ...OES NOT CREATE NEW WARRANTIES OR MODIFY THE EXISTING WARRANTIES Standards Compliance for the SEM3 Product Approvals and Certifications Accuracy ANSI C12 1 ANSI C12 20 0 2 Safety and Construction CSA C22 2 No 1010 1 Safety Requirements for Electrical Equipment for Measurement UL 916 Energy Management Equipment UL61010 1 IEC 61010 1 Test and Measurement Equipment Electromagnetic Compatibility IEC 61...

Страница 3: ...3 4 6 2 SEM3 FCC Notice 4 6 3 Control Wiring 4 6 6 4 Other SEM3 Components 6 8 7 0 Configuring the Metering System 8 9 7 1 Assign Static IP Address 9 10 7 2 Web User Interface 10 7 3 Addressing the Meter Racks 10 11 8 0 Sample Network Topology 12 9 0 Additions to the Network 13 10 0 Contact Information and Support 13 11 0 Notes 14 17 This document makes frequent reference to both the Storage Insta...

Страница 4: ...le a claim with the carrier If there is no damage restore the packaging to its original condition to prepare for job site storage Store busway indoors in a clean and dry area with uniform temperature to minimize condensation Protect against mechanical damage and exposure to lime dust concrete water corrosive fumes or liquids and salts Failure to properly store and protect the busway can cause dama...

Страница 5: ...ntroller bus plug to limit the length of control wiring and the number of connection points in each network Bus plugs should be installed on the busway prior to connecting network control wiring Limits on control wiring length are noted in Section 6 3 TIP It is suggested to determine the network layout and meter module address plan PRIOR to installing bus plugs on the busway A meter module configu...

Страница 6: ...use in 600V applications Care should be taken to follow codes and standards for clearance and isolation of Class 2 wiring from power wiring These are NOT standard Ethernet cables Figure 1 Meter Module Configuration Label Figure 2 600V Isolated Communication Cables CAUTION Failure to use SEM3 components from Siemens could cause damage to the product and place the user at risk of electrical shock or...

Страница 7: ...roller in this bus plug will aggregate inputs from metered plugs and output data via the Ethernet port marked PC on the front of the bus plug 10 100BASE T port with an RJ45 modular connector The Ethernet port is capable of data rates up to 100Mbps TIP It is generally recommended to balance the number of meter modules connected to ports R1 and R2 on the controller bus plugs 5 Communication cables b...

Страница 8: ...cing an audible click when locked into position The Meter Rack provides a hard coded address for each meter module Two and three phase circuits require meter modules to be installed contiguously in the rack Gaps between modules prevent multi pole circuit output Each module must have the phase 6 switch on the top of the module set to the phase that the CT is metering Phase A B or C Line 1 2 or 3 re...

Страница 9: ...ns a fused switch that controls power to the SEM3 controller This switch is shipped in the ON position meaning the SEM3 will turn on when the plug is installed and the busway is powered The fusible switch may be used to turn off the controller Control power for the SEM3 is tapped off the bus on the line side of the breakers so metering continues even when the breakers are in the OFF position 7 ...

Страница 10: ...TEM To start Connect the controller to a PC using the Ethernet Modbus TCP port The port labeled PC is located on the front surface of the control module as shown in Figure 9 Connection to this port requires a CAT6 cable This PC port may alternately be connected to an Ethernet switch to consolidate multiple ontroller outputs CONTROLLER ...

Страница 11: ...nd select Network and Sharing Center when displayed 2 Then when the Network and Sharing Center opens click on Change adapter settings 3 Right click on your local adapter and select Properties 4 In the Local Area Connection Properties window highlight Internet Protocol Version 4 TCP IPv4 then click the Properties button 5 Select the radio button and enter the correct IP address Ex 192 168 1 100 and...

Страница 12: ...re 10 Six Pole Meter Module Rack with 10 Position Rotary Switch Note Meter racks are internal to the bus plug However a view port with rotary switch access hole allows the user to ensure proper phasing of the meter modules and verify that they are receiving power The small hole over the rotary switch allows for the rack to be addressed without opening the bus plug cover The location of the six met...

Страница 13: ... 4 33 34 34 34 35 35 35 36 36 37 9 37 37 38 38 38 39 39 40 41 A 41 5 41 42 42 42 43 43 43 44 44 45 B 45 45 46 46 46 47 47 48 49 C 49 6 49 50 50 50 51 51 51 52 52 53 D 53 53 54 54 54 55 55 56 57 E 57 7 57 58 58 58 59 59 59 60 60 61 F 61 61 62 62 62 63 63 Rotary switch adressing setting of 0 is identical to that of 8 similarly 1 is identical to 9 This means racks with switch settings of 0 and 8 or 1...

Страница 14: ... metering in each bus plug The run above consists of 7 six pole plugs meaning 42 poles are monitored by the one controller bus plug located in the middle of the run Note that this configuration is within the 45 meter limitation for the maximum number of poles monitored by one SEM3 controller Additionally the maximum length of 600V isolated communication cable for 24 meters or more is 60 feet Five ...

Страница 15: ... so as to uniquely address the meters in the new bus plug see Section 7 3 to address the meter rack appropriately Daisy chain the isolated communication cable to the neighboring plug per Section 6 3 The meters will be visible via the controller they are connected to If a SCADA system is integrated with the SEM3 network additional steps may be required to integrate any system modifications or new m...

Страница 16: ...14 s l SEM3 Metered Bus Plug for SENTRON Busway Systems 11 Notes ...

Страница 17: ...15 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Страница 18: ...16 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Страница 19: ...17 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Страница 20: ...ication in the course of further development of the products The requested performance features are binding only when they are expressly agreed upon in the concluded contract Siemens Industry Inc 5400 Triangle Parkway Norcross GA 30092 1 800 241 4453 info us siemens com Subject to change without prior notice Order No BUIM SEN36 0516 Printed in USA All rights reserved 2016 Siemens Industry Inc usa ...

Отзывы: