![Siemens RuggedCom WIN7023 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/siemens/ruggedcom-win7023/ruggedcom-win7023_installation-manual_374300028.webp)
Chapter 2
Installing the Base Station
RUGGEDCOM WIN7023
Installation Guide
20
Connecting an SFD Type Base Station
5
7
3
1
2
4
6
Figure 13: SFA Wiring Scheme
1.
RUGGEDCOM WIN7023
2.
PoE Cable
3.
DC Power System
4.
AC Power Cable
5.
AC Power Supply (100 to 240 VAC)
6.
Fiber
Optic Ethernet Cable
7.
Switch/Router
2. Tighten the base station end of the PoE cable to 4 N·m (35.4 lbf-in).
3. Connect a fiber optic Ethernet cable between the
F/O
port on the base station and a 1000Base-LX fiber optic
port on a switch or router.
4. Torque the base station end of the fiber optic Ethernet cable to 4 N·m (35.4 lbf-in).
Section 2.9.3
Connecting an SFD Type Base Station
The operator is required to provide an external DC power system for SFD type base stations. The chosen power
system must comply with the requirements for a Class II (or double insulated) electrical appliance and be safety-
certified according to national codes. Further requirements include:
Maximum Output Current
5 A
Maximum Output Voltage
60 VDC
Minimum Output Voltage
42 VDC
To connect an SFD type base station to the operator's DC power system and network, do the following:
1. Connect the metal connector of the supplied power cable to the power system.
2. Connect the wires at the open end of the cable to the power system.