20/22
Building Technologies
CC1N7435en
HVAC Products
11.01.2007
Internal diagram and time diagram of the programming mechanisms (cont’d)
LGB22... / LGB32...
Legend
AL Alarm
AR
Load relay with contact «ar»
AS Unit
fuse
BR
Locking relay with contact «br»
BV... Fuel
valve
EK... Lockout
reset
button
FR Flame
relay
GP Gas
pressure
switch
HS Mains
isolator
ION Ionization
probe
L1
Lockout warning lamp
LP Air
pressure
switch
M Fan
motor
MS Synchronous
motor
R
Control thermostat or pressurestat
SB
Safety limit thermostat
W
Limit thermostat or pressure switch
GP/
SB
W
R
HS
0
I
L N
M
LP
74
35
i02/
0
7
04
Z
BV2
BV1
EK2
AL
EK1
12
3
1)
6
11
1
7
5
4
9
8
10
2
a
b
br
AS
I
ar
a
b
a
b
FR
AR
III
a
b
IV
a
b
fr
a
b
II
a b
VIII
a
b
V
a
b
VI
a
b
IX
a
b
VII
a
b
L1
BR
MS
ION
1
Nur LGB22...
1
sw
QRC1...
12
br
bl
2
Nur LGB32...
Z Ignition
transformer
A
Start position (switching on)
B
Operating position of burner
C
Operating position of programming mechanism or start
position
I...IX Cam
switches
tw Waiting
time
TSA Ignition
safety
time
T
Total running time of programming mechanism
t1 Prepurge
time
t3 Preignition
time
t4
Interval «BV1 – BV2» or «BV1 – LR»
t10
Specified time for air pressure signal
t11
Programmed opening time for actuator «SA»
t12
Programmed closing time for actuator «SA»
t20
Interval up to self-shutdown of programming
mechanism
A
B
C
74
35
f0
5/1
2
9
9
9
4
7
5
3
T = 81 s
FR
a
b
AR
IX
VIII
VII
VI
V
IV
III
II
I
tw
t11 + t10
t1
t12
t3
TSA
t4
t20
a
b
a
b
a
b
a
b
a
b
a
b
a
b
a
b
a
b
a
b
1)
Resistance between terminal 3 and «N» must not ex-
ceed 1.6 k
Ω