3/11
Building Technologies Division
CC1N7454en
20.11.2017
Commissioning notes
Prior to commissioning, check to ensure that wiring is in an orderly state
When commissioning the plant or when doing maintenance work, make the following
safety checks:
Safety check to be carried out
Anticipated response
a) Burner startup with ionization cable
disconnected
Lockout at the end of safety time
(TSA)
Standards and certificates
Applied directives:
Low-voltage
directive
2014/35/EC
Directive for gas-fired appliances
2009/142/EC
Directive for pressure devices
2014/68/EC
Electromagnetic compatibility EMC (immunity) *)
2014/30/EC
*) The compliance with EMC emission requirements must be checked after the burner control is
installed in equipment
Compliance with the regulations of the applied directives is verified by the adherence to
the following standards / regulations:
Automatic burner control systems for burners and
appliances burning gaseous or liquid fuels
DIN EN 298
Safety and control devices for gas burners and gas burning
appliances
DIN EN 13611
Automatic electrical controls for household and similar use
Part 2-5: Particular requirements for automatic electrical
burner control systems
DIN EN 60730-2-5
The relevant valid edition of the standards can be found in the declaration of
conformity!
Note on
DIN EN 60335-2-102
Household and similar electrical appliances - Safety - Part 2-102:
Particular requirements for gas, oil and solid-fuel burning appliances having electrical
connections. The electrical connections of the LFL1.148 and the AGM comply with the
requirements of EN 60335-2-102.
EAC Conformity mark (Eurasian Conformity mark)
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
China RoHS
Hazardous substances table:
http://www.siemens.com/download?A6V10883536
Certified complete with plug-in base: