Siemens LCM-OAVS 570-804PA Скачать руководство пользователя страница 2

Document No. 570-114  
Installation Instructions  
October 26, 2016 

Page 2 of 8

 

Siemens Industry, Inc.

 

Offboard Air Module – two required, 

order separately  

550-819B  

Siemens fast-acting Lab Electronic 

Actuator(s) – order and ship separately) 

GNP191.1U 

 

 

Shipping carton includes a controller assembly, a 

mounting rail, and two self-tapping/drilling screws. 

 

 

CAUTION 

Keep the unit in its static-proof bag 

until installation. 
Otherwise, you run the risk of 

damage to the printed circuit board 

from electrostatic discharge. 

Accessories 

 

Low cost temporary temperature 

sensor, 10K Ω thermistor with 

RJ11 (1” long), that enables space 

control if the permanent room or 

duct sensor is not installed (pack of 

25). 

540-658P25 

Duct Temperature Sensor, NTC 

10K Ω Type 2, 3" Probe for 

Commissioning only. 

QAM1030.008P50 

 

 

Warning/Caution Notation 

 

 

WARNING 

Personal injury/loss of life may 

occur if you do not follow the 

procedures as specified. 

 

 

 

CAUTION 

Equipment damage or loss of data 

may occur if you do not follow the 

procedures as specified. 

Required Tools and Equipment 

  Small flat blade screwdriver 

  3/8-inch open end wrench 

  Needle nose pliers 

  1/4-inch poly tubing 

 

Prerequisites 

  Wiring conforms to NEC and local codes and 

regulations. For further information, see the 

Wiring Guidelines Manual

 (125-3002). 

 

(Optional)

 Room temperature sensor installed. 

  24 Vac Class 2 power available. 

  Supply power to the unit is OFF. 

  Any application specific hardware or devices 

installed. 

 

NOTE: 

A low-cost temporary RTS (540-658P25) 

is available that plugs into the RTS port 

on the controller, providing temperature 

input and actual space control until a 

permanent RTS is installed. 

Expected Installation Time 

30 minutes 

Installation Instructions 

 

NOTE: 

All wiring must conform to national and 

local codes and regulations (NEC, CE, 

and so on). 

1.  Secure the mounting rail in the controller’s 

desired location. 

2.  Place the ESD wrist strap on your wrist and 

attach it to a good earth ground. 

3.  Remove the controller from the static proof bag 

and snap it into place on the mounting rail. 

4.  If the controller will be used with a field panel, 

disconnect the field level network (FLN) trunk 

from the field panel. 

5.  Wire the FLN trunk to the controller. After all 

controllers are connected to the FLN, reconnect 

the FLN trunk to the field panel. 

Содержание LCM-OAVS 570-804PA

Страница 1: ...ves One Exhaust One Supply features VAV control of a laboratory room with one supply duct one exhaust duct and up to six Fume Hoods It uses fast acting electronic actuators shipped separately to control the supply and exhaust Venturi air valves This controller is built on a BACnet Programmable TEC PTEC platform that supports up to two Offboard AVS signals however Onboard AVS transducers are not su...

Страница 2: ...nt Small flat blade screwdriver 3 8 inch open end wrench Needle nose pliers 1 4 inch poly tubing Prerequisites Wiring conforms to NEC and local codes and regulations For further information see the Wiring Guidelines Manual 125 3002 Optional Room temperature sensor installed 24 Vac Class 2 power available Supply power to the unit is OFF Any application specific hardware or devices installed NOTE A ...

Страница 3: ... use one trunk for the FFM and FHC and another trunk for the actuator s and LCM 8 For each Fast Acting Lab Electronic Actuator verify that the switches are set as shown in Figure Switch Settings for the Fast Acting Lab Electronic Actuator Supply Exhaust Switch Settings for the Fast Acting Lab Electronic Actuator CAUTION This actuator requires a maximum of 20 VA 24 Vac source DO NOT connect any oth...

Страница 4: ...sensor is used Failure to follow wiring precautions will result in equipment damage Wiring for AI with a 4 to 20 mA Sensor CAUTION Each 4 20 mA sensor requires a SEPARATE dedicated power limited 24 Vdc power supply DO NOT use the same transformer to power both the sensor and the controller NOTE If the voltage current switch is set to current and a 4 to 20 mA sensor is connected to an AI then speci...

Страница 5: ...O3 16 Common jumper NOTE The controller s DOs control 24 Vac loads only The maximum rating is 12 VA for each DO An external interposing relay is required for any of the following VA requirements higher than the maximum 110 or 220 Vac requirements DC power requirements Separate transformers used to power the load for example part number 540 147 Terminal Equipment Controller Relay Module NOTE Thermi...

Страница 6: ...nt No 570 114 Installation Instructions October 26 2016 Page 6 of 8 Siemens Industry Inc BACnet LCM OAVS with Hot Water Reheat and Two Venturi Air Valves One Exhaust One Supply Application 6750 Wiring Diagram ...

Страница 7: ...70 114 Installation Instructions October 26 2016 Siemens Industry Inc Page 7 of 8 BACnet LCM OAVS with Hot Water Reheat BTU Compensation Two Venturi Air Valves One Exhaust One Supply Application 6756 Wiring Diagram ...

Страница 8: ...urity management and physical security systems The security functions on these products solutions and services are important components of a comprehensive security concept Drafting implementing and managing a comprehensive and up to date security concept customized to individual needs is nevertheless necessary and may result in additional plant or site specific preventive measures to ensure secure...

Отзывы: