
Operating
7.12 Open Channel Monitoring (OCM)
HydroRanger 200 HMI
Operating Instructions, 06/2018, A5E36281317-AC
137
7.12
Open Channel Monitoring (OCM)
An OCM installation is defined three ways, with each one based on the Primary Measuring
Device (PMD) used:
1.
Dimensional [Primary Measuring Device (2.13.2.) = Palmer-Bowlus Flume, H-Flume,
Rectangular Flume BS-3680, or Thin Plate V-Notch Weir BS-3680]
–
BS-3680/ISO 1438/1 Thin Plate V-notch weir (Page 141)
–
BS-3680/ISO 4359 Rectangular Flume (Page 142)
–
Palmer-Bowlus flume (Page 143)
–
For some common weir and flume types. PMD dimensions [PMD Dimensions (2.13.5.)
(Page 246) ] are entered directly.
2.
Exponential [Primary Measuring Device (2.13.2.) = Exponential devices]
For most other weir and flume types. PMD exponents provided by the manufacturer are
entered. Flow is calculated using the exponent [Flow Exponent (2.13.4.1.) (Page 241) ]
and the maximum values [Maximum Head (2.13.4.2.) (Page 243) and Maximum Flow
(2.13.4.3.) (Page 243) ].
–
Standard weirs (Page 145)
–
Parshall Flume (Page 148)
–
Leopold-Lagco flume (Page 149)
–
Cut throat flume (Page 150)
3.
Universal [Primary Measuring Device (2.13.2.) = Universal Linear Flow Calculation,
Universal Curved Flow Calculation]
For all other PMDs, the head-to-flow curve can be plotted based on known breakpoints,
usually supplied by the PMD manufacturer.
–
Example flumes (Page 152)
–
Example weir profiles (Page 153)
–
Содержание HydroRanger 200 HMI
Страница 2: ......
Страница 20: ...Introduction 1 5 Notes on warranty HydroRanger 200 HMI 18 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 24: ...Safety notes HydroRanger 200 HMI 22 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 28: ...Description 3 5 Modbus communication HydroRanger 200 HMI 26 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 159: ...Parameter reference 8 2 Parameter indexing HydroRanger 200 HMI Operating Instructions 06 2018 A5E36281317 AC 157 ...
Страница 276: ...Parameter reference 8 10 Language 6 HydroRanger 200 HMI 274 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 322: ...Pump control reference B 13 Other pump controls HydroRanger 200 HMI 320 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 352: ...Communications C 41 Single parameter access SPA HydroRanger 200 HMI 350 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 354: ...Updating software HydroRanger 200 HMI 352 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 359: ...HydroRanger 200 HMI Operating Instructions 06 2018 A5E36281317 AC 357 Conduit entry for Class I Div 2 applications F ...
Страница 360: ...Conduit entry for Class I Div 2 applications HydroRanger 200 HMI 358 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 361: ...Conduit entry for Class I Div 2 applications HydroRanger 200 HMI Operating Instructions 06 2018 A5E36281317 AC 359 ...
Страница 362: ......
Страница 372: ...Programming chart G 1 Programming chart HydroRanger 200 HMI 370 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 390: ...LCD menu structure H 1 LCD Menu Structure HydroRanger 200 HMI 388 Operating Instructions 06 2018 A5E36281317 AC ...
Страница 403: ......