
start_h3.fm
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
5-3
Starting Up HiPath 3000
Starting Up HiPath 3800
5.2.2
Supplying the System with Power
Procedure
RUN LEDHiPath 3800
The CBSAP features a RUN LED that signals the system boot status in three phases:
●
Phase 1: Basic tasks (recovery, database, query) are started.
●
Phase 2: Loadware is installed for peripheral boards.
●
Phase 3: Data is installed for peripheral boards.
The RUN LED flashes at a different rhythm to indicate each specific phase. The phases are
always separated by a 3-second pause during which the LED is not lit.
Step
Activity
1.
Plug in the power supply cable for the system cabinet(s).
2.
Position all LUNA2 power supply switches to “DC-ON”.
Note: Startup does not begin until the switches on all LUNA2 units are in “DC-ON”
position.
3.
Monitor the RUN LED of the CBSAP. The individual steps of the system boot
(Table 5-2) can be observed this way.
Table 5-2
RUN LED - LED Status Meaning
RUN LED
Meaning
1st flash-
ing
rhythm
2nd flash-
ing
rhythm
3rd flash-
ing
rhythm
short
short
long
Phase 1: Basic tasks (recovery, database, query) are
started.
short
long
short
Phase 2: Loadware is installed for peripheral boards.
short
long
long
Phase 3: Data is installed for peripheral boards.
Definition of the flashing rhythms:
●
short = 0.25 s on/0.25 s off
●
long = 0.75 s on/0.25 s off
>
The HiPath 3800 is ready when the date “1. JAN 00” and the time “00:00” appear in
the display on the system telephone.
Содержание HiPath 3000 V3.0 or later Gigaset M1 Professional
Страница 1: ...HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual ESHB 60 004 05 09 22 09 05 ...
Страница 1168: ...Figures P31003 H3560 S403 54 7620 09 05 W 12 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOF fm ...
Страница 1178: ...Tables P31003 H3560 S403 54 7620 09 05 X 10 HiPath 3000 V6 0 HiPath 5000 V6 0 Provisional Service Manual hp3hp5shLOT fm ...
Страница 1201: ......