Installation
2
6 | 16
Building Technologies
A6V10590197_en--_a
Siemens Industry, Inc.
2016-02-26
2 Installation
Figure 1: Installing the FHA2054 audio transformer kit
1
Shield connection terminal block
2
The FHA2054 audio transformer kit is mounted on the busbar
3
2x #4-40 pan-head Phillips screws, L ¼"
4
Busbar L=100 mm with 2x fastening tabs
5
2x threaded standoffs in back box
1. Plug the shield connection terminal block (1) onto the busbar (4) from above.
2. Screw the busbar (4) with pre-mounted audio transformer kit (2) and the shield
connection terminal block (1) with both screws (3) into the threaded standoff on
the back box (5).
1
2
3
4
5
firealarmresources.com