Mounting / Installation
Environmental influences
5
23 | 32
Building Technologies
A6V10201150_d_en_--
Fire Safety
2018-12-19
5 Mounting / Installation
Preparation
If using back box FDMH295-R, you have to determine the positions of the lead-in
openings. If the lead-in openings are on the top or bottom, you must determine
them with the drilling jig (product insert).
Procedure
Figure 6: Mounting
Note the positive and negative poles!
1.
Mount the back box at a height of 1.3…1.6 m on a flat surface.
2.
If the detector line cables are shielded, connect the shieldings to a connection
terminal (to be ordered separately). The shielding must not touch any other
potentials or metal parts in the device.
3.
Connect the detector line. Only connect one wire per terminal.
4.
Insert an end-of-line element (EOL) at the end of each collective detector line
into the terminals. The end-of-line element is specific to the control panel.
5.
Remove the cover cap of the manual call point using the key (movements A
and B). Keep the key in a safe place.
6.
Secure the switching unit to the wall or back box. You will find the screws you
need for the back box in the switching unit.
7.
Assemble the manual call point. Be sure to tension the spring with the plastic
insert or glass insert.
A
B