![Siemens FCM-6S Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/siemens/fcm-6s/fcm-6s_installation-instructions-manual_377124003.webp)
Siemens Industry, Inc.
Building Technologies Division
P/N 315-035800-2
3
12
34
5
6 7
8 9
0
12
34
5
6 7
8 9
0
PLUG-IN
CABLE
CONNECTION
P1
P2
ROTARY
ADDRESS SWITCHES
Figure 5
FCM-6S, LCM-8S , SCM-8S Address Switches And
Cable Connections
INSTALLATION
CAN Sounder Board
The CSB is normally positioned at the last FCM, LCM or SCM. If desired, multiple
CSBs can be installed. The CSB mounts on the stud of the FCM/LCM/SCM module
that it connects to.
1.
Determine the position of the CSB. (This is normally at the last FCM, LCM
or SCM module.)
2.
If necessary, remove nut from stud of FCM/LCM/SCM where CSB is to be
mounted.
2.
Place mounting hole on the CSB over stud.
3.
Secure with nut supplied with FCM/LCM/SCM.
WIRING
(Refer to Figure 7.)
Remove ELECTRICAL POWER prior to working on equipment.
•
Each FCM/LCM/SCM module is a node in the CAN bus.
•
Each FCM/LCM/SCM connects through the CC-5/CC-2 CAN bus via a
plug-in cable to the NIC or to another FCM/LCM/SCM module.
•
Up to 99 FCM/LCM/SCM modules, in any combination, can be connected
to the CAN bus of each NIC.
•
Each FCM/LCM/SCM/CSB module is shipped with one CCS cable.
Figure 6
Inserting A Label Into The Back Of The FCM-6S