DETECTOR AND BASE PLACEMENT

Detector and base locations shall follow the drawings

provided or approved by Siemens Building Technologies, Inc.

or its authorized distributors. This is extremely important! The

detector placements shown on these drawings were chosen

after a careful evaluation of all facets of the protected area.

When drawings are not available, refer to 

Detector Placement

section of detector Installation/Wiring Instructions and to
NFPA Standard 72 and CAN/ULC-S524.

BASE WIRING

Siemens Building Technologies, Inc.'s detectors should be

interconnected as shown in Figures 1, 2 or 3 and wired

to the control panel following the wiring connection drawing

installed on the inside face of each control panel cover. NOTE:

H Series devices are wired to the DLC (refer to DLC

Installation Instructions, P/N 315-033090.) 

Note any

limitations on the number of detectors and restrictions on

the use of remote devices permitted for each circuit.

DETECTOR MOUNTING USING THE DB-11/-11E BASE

T

he detector is provided with a separate base which attaches

to a standard 4 inch square, 4 inch octagonal, or single gang

electrical box, with the box size and depth required by the

NEC for the number and size of conductors used. Wire size:

max – 14 AWG, min – 18 AWG.

Installation Instructions P/N 315-094193-7

Model DB-11/-11E

(P/N 500-094151/500-094151E)

Figure 4

Mounting The DB-11 Base

Siemens Building Technologies, Inc.

8 Fernwood Road

Florham Park, New Jersey  07932

Siemens Building Technologies, Ltd.

2 Kenview Boulevard

Brampton, Ontario, Canada  L6T 5E4

BASE
MOUNTING
HOLES

MOUNTING
HOLE COVERS

USE DBJ-11 JUMPER

KIT, P/N 500-699167

FOR CONTINUITY

CHECK WITH PE-11,

PE-11T OR DT-11

DETECTORS

ALARM LED

LOCATION WITH

DETECTOR

INSTALLED

IN BASE

6

5

1a

1b

DO

NOT

PAINT

FACTORY
INSTALLED
JUMPER

BASE
MOUNTING
HOLE

ALARM LED

LOCATION WITH

DETECTOR

INSTALLED

IN BASE

Figure 5

Mounting The DB-11E Base

Refer to Figures 4 and 5, as applicable.

1. Route all wires outward from outlet box.
2. When ALARM LED viewing is critical, position the LED mark in the base in the intended direction.
3. Route wires through the hole in the center of the base and mount base to outlet box. Make connections

directly to the base terminals. Refer to Figures 1, 2 and 3 for details.

4. After all bases are installed, check loop continuity. Refer to the System Manual for the loop continuity check

procedure. To allow for the continuity check with PE-11, PE-11T or DT-11 detectors, use DBJ-11 Jumper Kit, P/N

500-699167 (between terminals 1a and 1b) to complete the loop. Do not use a jumper for FP-11/HFP-11/FS

family devices.

5. Continuity jumper must be removed from each base prior to installing detector.
6. To insure proper installation of the detector head into the base:

a. Route wires away from connector terminals.

b. Take up all slack in the outlet box.

c. Properly dress and position all wires flat against the base.

d. Check that screw terminals are tight.

7. (DB-11 only) Break off the two mounting hole covers, and insert in two outer base mounting holes.