background image

Configuration 

 

 

 

CP 5711 

24

 

Operating Instructions, 02/2018, C79000-G8976-C283-05 

Содержание CP 5711

Страница 1: ..._________________ ___________________ ___________________ SIMATIC NET PG PC PROFIBUS CP 5711 Operating Instructions 02 2018 C79000 G8976 C283 05 Preface Description of the device 1 Software installation 2 Hardware installation 3 Configuration 4 Technical specifications 5 Approvals A Dimension drawing B ...

Страница 2: ...n may be operated only by personnel qualified for the specific task in accordance with the relevant documentation in particular its warning notices and safety instructions Qualified personnel are those who based on their training and experience are capable of identifying risks and avoiding potential hazards when working with these products systems Proper use of Siemens products Note the following ...

Страница 3: ...ber 6GK1 571 1AA00 Content of this documentation These operating instructions contain information about the installation and configuration of the CP 5711 communications processor Updated operating instructions on the Internet You will find the current version of these operating instructions on the Product Support pages under the following entry ID 34803449 https support industry siemens com cs ww ...

Страница 4: ...cription of the OPC interface as user programming interface Installation manual SIMATIC NET PC Software This document contains detailed information on installing the SIMATIC NET PC Software Entry ID 77377602 https support industry siemens com cs ww en view 77377602 System manual PROFIBUS Network Manual In this document you will find detailed information about setting up a PROFIBUS network Entry ID...

Страница 5: ...em from planning and implementation to commissioning through to maintenance and modernization You will find contact data on the Internet at the following address http www automation siemens com partner guiwelcome asp lang en SITRAIN Training for Industry The training offer includes more than 300 courses on basic topics extended knowledge and special knowledge as well as advanced training for indiv...

Страница 6: ...Preface CP 5711 6 Operating Instructions 02 2018 C79000 G8976 C283 05 ...

Страница 7: ...aning of the LED display 12 2 Software installation 13 2 1 Installing the SIMATIC NET PC Software 13 2 2 Uninstalling the SIMATIC NET PC Software 14 3 Hardware installation 15 3 1 Connecting to the PG PC 15 3 2 Hardware compatibility 18 3 3 External power supply 19 3 4 Installing on a DIN rail 21 4 Configuration 23 5 Technical specifications 25 A Approvals 27 B Dimension drawing 31 ...

Страница 8: ...Table of contents CP 5711 8 Operating Instructions 02 2018 C79000 G8976 C283 05 ...

Страница 9: ...to 12 Mbps Floating RS 485 connector Linking of up to 32 devices PC PG SIMATIC S7 or ET 200 to form a network segment By linking several segments with repeaters up to 64 nodes can be connected The additional interface signals for a direct link to a PLC Programmable Logic Controller are supported up to 187 5 Kbps Connection to PGs and PCs with a USB Interface At the CP end Type B with locking mecha...

Страница 10: ...76 C283 05 Appearance The following figure shows the CP 5711 communications processor mounted on a 35 mm DIN rail 1 USB interface type B with USB cable 2 LEDs 3 DIN rail 4 PROFIBUS interface with D sub male connector 5 Terminals for external 24 V power supply 6 Ground connection cannot be seen in the figure ...

Страница 11: ...IN assignment The D sub female connector has the following pin assignment PIN Short name Meaning Input output 1 NC Socket pin 1 is not connected 2 NC M24 Socket pin 2 is not connected With other MPI DP components the return line of the floating 24 V power supply may be via this pin 3 LTG_B Signal line B of the PROFIBUS connector Input output 4 RTSAS RTSAS input signal for direct MPI link The contr...

Страница 12: ...a the exter nal power supply Off There is no external power supply connected to the CP Power is sup plied only via the active USB interface IDENT green Flashes regularly Identification of the CP 5711 to distinguish it from other CPs in the same PG PC Using a relevant diagnostics function in the Communications Settings configuration tool or the Station Configuration Editor you can activate these LE...

Страница 13: ... the BIOS of your PG PC Prior to hardware installation Install the software as described in the installation manual SIMATIC NET PC Software You will find this installation manual on the Product Support pages under the following entry ID 77377602 https support industry siemens com cs ww en view 77377602 You should also note the current information on the SIMATIC NET PC software on the Product Suppo...

Страница 14: ... The recommended procedure removes the entire SIMATIC NET PC Software on the PG PC not only the driver for the communications processor Uninstall the entire software package as described and recommended in the installation manual SIMATIC NET PC Software You will find the installation manual on the SIMATIC NET PC Software DVD or on the Product Support pages under the following entry ID 77377602 htt...

Страница 15: ...If the cable or conduit entry point exceeds 70 C or the branching point of conductors exceeds 80 C special precautions must be taken If the device is operated at an ambient temperature of 0 C 60 C make sure that you use cables with a permitted ambient temperature of at least 80 C WARNING EXPLOSION HAZARD Take measures to prevent transient voltage surges of more than 40 of the rated voltage This is...

Страница 16: ... bulk memory on the PG PC can impair the performance of the communications processor Note Removing and inserting USB devices can cause functional disruptions on the USB interface In extreme cases communication via the communications processor may even be aborted making it necessary to restart the application Note First install the software First install the software before you connect the communic...

Страница 17: ...on to PG PC To achieve the guaranteed configuration limits with all protocols and at all bus transmission speeds you should use at least a USB 2 0 high speed connector You should preferably use the USB connectors located at the back of the housing of your PG PC The front USB connectors usually have a lower signal quality We recommend that you do not use any additional USB hubs Removing the CP 5711...

Страница 18: ...lowing When loading the CP 5512 configuration the CP 5512 has priority over a CP 5711 As long as a CP 5512 is connected its configuration cannot be adopted by a CP 5711 You should therefore remove the CP 5512 from your PC PG Procedure for replacement To replace a configured connected CP 5512 with a CP 5711 follow the steps below 1 Delete the configured CP 5512 from the Station Configuration Editor...

Страница 19: ...c pulses on the supply lines Such coupling can result for example due to lightning or switching of large inductive loads One of the tests used to attest the immunity of the communications processor to electromagnetic interference is the surge immunity test according to EN 61000 4 5 This test requires overvoltage protection for the power supply line A suitable device is for example the Dehn Blitzdu...

Страница 20: ...o EN 60950 Disconnection from the external power supply NOTICE First disconnect the USB connection Keep to the order below if you disconnect the communications processor from the external power supply Otherwise you may encounter uncontrolled interruptions in communication Follow the steps below to disconnect the communications processor from the external power supply 1 First shut down any communic...

Страница 21: ...is holder under the article number 6GK1 571 1AA00 0AH0 Safety notice WARNING When used in hazardous environments corresponding to Class I Division 2 or Class I Zone 2 the device must be installed in a cabinet or a suitable enclosure To comply with EC Directive 94 9 ATEX95 this enclosure must meet the requirements of at least IP54 in compliance with EN 60529 Procedure A Upper DIN rail holder B DIN ...

Страница 22: ...o that the PROFIBUS connector points down 3 Pull down the DIN rail slide and hold it in position 4 Press the lower DIN rail holder against the lower edge of the DIN rail 5 Release the DIN rail slider The catch in the lower DIN rail holder locks onto the DIN rail Removing the communications processor from the DIN rail To release the locking mechanism in the lower DIN rail holder pull the DIN rail h...

Страница 23: ...lable STEP 7 V5 5 STEP 7 Professional TIA Portal Communication Settings COML S7 The steps involved are described in the Commissioning PC Stations manual or in the relevant online helps Compatibility during configuration If there is not yet a CP 5711 in the hardware catalog of your STEP 7 version you can select a CP 5512 for configuration The CP 5711 is compatible with the configuration of the CP 5...

Страница 24: ...Configuration CP 5711 24 Operating Instructions 02 2018 C79000 G8976 C283 05 ...

Страница 25: ...PC CP end PG PC end Minimum requirement USB socket type B with locking mechanism USB socket type A V 2 0 Plug and play Electrical specifications of the USB connection Operating voltage Rated voltage 5 VDC Permitted range 4 75 to 5 25 VDC Properties Safety extra low voltage SELV to EN 60950 Direct supply via USB if provided by the PG PC external power supply possible Current consumption Maximum 500...

Страница 26: ...on Rapid temperature change EN 60068 2 14 40 70 C 2 cycles Vibration operating EN 60068 2 6 Frequency 10 58 Hz Frequency 58 500 Hz Number of cycles 0 075 mm amplitude 10 m s2 Acceleration 10 axis Shock operating EN 60068 2 27 Half sine Time Number of shocks 50 m s2 5 g 30 ms 100 axis Design dimensions and weight Module format USB module Weight Approx 300 g Dimensions W x H x D in mm 85 x 137 x 35 ...

Страница 27: ...lication Requirements Emission Immunity Residential areas business and commercial opera tions and small businesses EN 61000 6 3 EN 61000 6 1 Industrial environment EN 61000 6 4 EN 61000 6 2 ATEX and FM approval hazardous location The communications processor has the following approvals relating to hazardous areas KEMA 07 ATEX 0145 EN 60079 15 EN 60079 0 Ex II 3 G Ex nA IIC T4 Gc FM 3611 Hazardous ...

Страница 28: ...ind the current versions of the standards in the currently valid IECEx certificates EC declaration of conformity You will find the EC declaration of conformity for this communications processor on the Product Support pages under the following entry ID 58826997 https support industry siemens com cs ww en view 58826997 C TICK approval The communications processor meets the requirements of the Austra...

Страница 29: ...ronment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense This device complie...

Страница 30: ...Approvals CP 5711 30 Operating Instructions 02 2018 C79000 G8976 C283 05 ...

Страница 31: ...CP 5711 Operating Instructions 02 2018 C79000 G8976 C283 05 31 Dimension drawing B CP 5711 front view and view from above All dimensions in millimeters ...

Страница 32: ...Dimension drawing CP 5711 32 Operating Instructions 02 2018 C79000 G8976 C283 05 Front view and side view of the DIN rail holder All dimensions in millimeters ...

Отзывы: