CAUTION 

Keep the unit in its static-proof 

bag until installation. 
Otherwise, you run the risk of 

damage to the printed circuit 

board from electrostatic 

discharge. 

Accessories 

 

Low cost temporary 

temperature sensor, 10K 

thermistor with RJ11 (1” 

long), that enables space 

control if the permanent room 

or duct sensor is not installed 

(pack of 25). 

540-658P25 

Duct Temperature Sensor, 

NTC 10K Ω Type 2, 3" Probe 

for Commissioning only 

QAM1030.008P50 

Expected Installation Time 

 

New controller installation  

10 Minutes 

Replacement (old controller has 

removable terminal blocks)  

6 Minutes 

Replacement (old controller does 

not have removable terminal 

blocks)  

16 Minutes 

 

 

NOTE: 

You may require additional time for 

database work at the field panel. 

Required Tools and Equipment 

  Small flat-blade screwdriver (1/8-inch blade 

width) 

  Cabling and connectors 

  Cordless drill/driver set 

  ESD wrist strap 

Prerequisites 

  Wiring conforms to NEC and local codes and 

regulations. For further information see the 

Wiring Guidelines Manual

 (125-3002). 

  Room temperature sensor installed (optional). 

  24 Vac Class II power available. 

  Supply power to the unit is OFF. 

  Any application specific hardware or devices 

installed. 

  Air velocity sensors installed in ducts. 

 

 

NOTE: 

If the controller is being installed on a 

box with 1 or more stages of electric 

heat, the 550-809 MOV with pre-

terminated spade connectors must be 

installed across the manufacturer-

supplied airflow switch. MOVs can be 

installed at the time the controller is 

factory mounted; coordinate with the 

box manufacturer prior to order 

placement. For field installation, see 

Metal Oxide Varistor Kit Installation 

Instructions

 (540-986). 

 

 

 

NOTE: 

A low-cost temporary RTS (540-

658P25) is available that plugs into the 

RTS port on the controller, providing 

temperature input and actual space 

control until a permanent RTS is 

installed. 

Installation Instructions 

 

 

NOTE: 

All wiring must conform to national and 

local codes and regulations (NEC, CE, 

etc.). 

1.  Secure the mounting rail in the controller’s 

desired location. 

2.  Place the ESD wrist strap on your wrist and 

attach it to a good earth ground. 

3.  Remove the controller from the static proof bag 

and snap it into place on the mounting rail. 

Содержание BACnet PTEC Dual Duct 2 AVS

Страница 1: ...uctions explain how to field install or replace a Siemens BACnet PTEC Dual Duct 2 AVS Controller Warning Caution Notation WARNING Personal injury loss of life may occur if you do not follow the procedures as specified CAUTION Equipment damage or loss of data may occur if you do not follow the procedures as specified Product Numbers Siemens BACnet PTEC Dual Duct 2 AVS Controller 550 497PA Shipping ...

Страница 2: ...or further information see the Wiring Guidelines Manual 125 3002 Room temperature sensor installed optional 24 Vac Class II power available Supply power to the unit is OFF Any application specific hardware or devices installed Air velocity sensors installed in ducts NOTE If the controller is being installed on a box with 1 or more stages of electric heat the 550 809 MOV with pre terminated spade c...

Страница 3: ... the nearest earth ground building steel conduit or duct work if earthed CAUTION It is very important that the neutral that supplies the TEC be earth grounded at the source of the 24 Vac power Possible erratic equipment operation or damage if neutral is left floating The installation is complete Wiring Diagrams CAUTION The controller s DOs control 24 Vac loads only The maximum rating is 12 VA for ...

Страница 4: ...rements must be followed NOTE When wiring any actuator that uses a 0 to 10V control signal and ties AC neutral to DC common an additional wire must connect the actuator AC neutral to the DC common of the PTEC TEC AO being used to control the actuator 24 Vac Modulating Control Actuator Symbol TEC Connection Function Terminal Connection Standard Color 1 H Supply SP G Red 2 C Neutral SN G0 Black 8 AO...

Страница 5: ...o 550 139 Installation Instructions October 26 2016 Siemens Industry Inc Page 5 of 6 Applications 6665 6666 6667 and 6668 with Hot Water Reheat Applications 6665 6666 6667 and 6668 with Electric Auxiliary Reheat ...

Страница 6: ...utomation and control fire safety security management and physical security systems The security functions on these products solutions and services are important components of a comprehensive security concept Drafting implementing and managing a comprehensive and up to date security concept customized to individual needs is nevertheless necessary and may result in additional plant or site specific...

Отзывы: