Installation
4.9 Installing and removing the shaft-mounted gearbox
BA 2030
50
Operating Instructions, 11/2017, A5E37880173A/RS-AE
4.9.6.3
Mounting torque arms on bevel gearboxes and helical worm gearboxes
NOTICE
Impermissible loading caused by incorrect mounting
The torque arm bush must be supported by bearings on both sides.
After assembly, the sleeve must have some axial play.
Figure 4-11 Mounting suggestion for torque arm on foot and flange
The torque arm can be fitted in various positions, depending on the hole circle pitch.
Figure 4-12 Toggle lever design
For a toggle lever design, derive the force in the range of 90° ±20°.
Procedure
1.
Clean the contact surfaces between the housing and the torque arm.
2.
Tighten the bolts to the specified torque.
You have now mounted the torque arm.
Table 4- 12 Tightening torque for screws of strength class 8.8
Thread size
M8
M10
M12
M16
M20
M24
M36
Tightening torque [Nm]
25
50
90
210
450
750
2 600
Содержание BA 2030 SERIES
Страница 1: ......
Страница 2: ......
Страница 22: ...Technical description 2 5 Surface treatment BA 2030 20 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 62: ...Operation BA 2030 60 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 66: ...Faults causes and remedies BA 2030 64 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 90: ...Disposal BA 2030 88 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 142: ...Technical data 10 6 Oil quantities BA 2030 140 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 160: ...Spare parts 11 2 Lists of spare parts BA 2030 158 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 164: ...Your suggestions BA 2030 162 Operating Instructions 11 2017 A5E37880173A RS AE ...
Страница 165: ......
Страница 166: ......