Instruction manual AQ101, AQ101D, AQ110P, AQ01
25 (48
)
4
C
OMMISSIONING
4.1
AQ101,
AQ101D,
AQ110P
ARC FLASH PROTECTION RELAYS
4.1.1
S
YSTEM INSTALLATION
When all the connections are done, the system shall be commissioned by installing
the devices one by one by pressing the set button according to the instructions on
chapter 3.1.3.
4.1.2
C
URRENT MEASUREMENT
(AQ110P
ONLY
)
Figure 4-1: Current measurement commissioning procedure.
Current measurement channels should be adjusted to the pick-up setting value by:
1)
Injecting the current level of desired pick-up value to IL1 and Io separately.
2)
Starting from maximum setting, adjusting the potentiometer slowly down.
3)
Corresponding current measurement channel LED lights steadily when the
activation with injected current has occurred.
IL1
–
IL3 measurement channels have a common adjustment
potentiometer “I>set”.
Therefore, each current channel is not
necessary to commission separately. Alternatively, channels IL1
–
IL3
can be injected with the same current in serial connection.
After successful commissioning, the device has to be re-installed
according to the instructions on chapter 3.1.
Содержание Arcteq AQ01
Страница 1: ...INSTRUCTION MANUAL AQ101 AQ101D AQ110P AQ01 ...
Страница 44: ...Instruction manual AQ101 AQ101D AQ110P AQ01 44 48 ...
Страница 45: ...Instruction manual AQ101 AQ101D AQ110P AQ01 45 48 ...
Страница 46: ...Instruction manual AQ101 AQ101D AQ110P AQ01 46 48 9 2 AX001 CONNECTION FIBER ...
Страница 47: ...Instruction manual AQ101 AQ101D AQ110P AQ01 47 48 9 3 AQ01 ARC FLASH SENSOR ...