GAMMA instabus
Technical Product Information
February 2019
Weather Station (GPS) AP 257/22
5WG1 257-3AB22
Siemens Switzerland Ltd
DS01
Update: http://www.siemens.de/gamma-td
Building Technologies Division
International Headquarters
Siemens AG 2019
Theilerstrasse 1a
Subject to change
CH-6300 Zug
4
Figure 4
Mounting
The supplied combined wall / mast holder is fastened to
the rear side of the housing with adhesive tape on
delivery.
Mounting on a wall:
Fasten the holder vertically with the even side to the
wall, with the crescent-shaped bar to the top (see fig. 5).
Figure 5
Mounting on a mast / pole:
Fasten the holder vertically with the curved side to the
mast / pole and the bar to the bottom (see fig. 6).
Figure 6
View of the rear wall and drilling scheme:
Dimensioning of the rear of the enclosure with holder:
see fig. 7,
drilling scheme: see fig. 8.
Figure 7
Figure 8
Preparing the weather station:
The lid of the weather station with the rain sensor is
slotted in on the right and the left at the lower edge.
Remove the lid from the weather station (see fig. 9).
Figure 9
Be careful not to tear open the cable connection be-
tween the circuit board in the bottom part and the rain
sensor in the lid (cable with plug).
Guide the bus connection through the rubber seals at the
bottom part of the weather station and connect the
cable pairs for the voltage supply and the bus to the