Siemens 8DO Скачать руководство пользователя страница 2

Document No. 129-565 
Installation Instructions 
April 28, 2015 
 

Page 2 of 5 

Siemens Industry, Inc.

 

 

Figure 1: EcoView™ 8 DO Module Reset Button Location. 

Commissioning the 8 DO Module 

In order to commission the EcoView 8 DO Module to 

the ZigBee network, the DO module needs to be reset.  

1.  Press the recessed Reset button four times in 

rapid succession (see Figure 1). 

 

The NET light stops flashing. 

  The NET light starts flashing again once it has 

joined the ZigBee network. 

2.  Press the Reset button once to send the Node ID 

information to the EcoView Touchscreen. 

Assigning the 8 DO Module to the 
Touchscreen 

1.  Press the EcoView Touchscreen CONFIG button 

for one second and then release it to display the 

Configuration screen (see Figure 6). 

2.  Press the DEVICE SETTINGS icon. 
3.  Press the Configure tab. 

 

The EcoView 8 DO Module’s MAC address displays 

in the Unassigned Nodes list. (See Figure 6.) 

 

Assigned and unassigned EcoView 8 DO 

Modules, EcoView Multi-phase Meters, and 

EcoView Thermostats display in the 

Configured Device list. 

NOTE: 

Join devices one-at-a-time. This minimizes any 
confusion caused by having several MAC 
addresses displayed on the screen at one time. 

4.

  Select a device from the 

Unassigned Nodes

 list 

to start the Device Configuration Wizard. 

 

Figure 2: Device Settings/Configure Tab. 

5.

  Select the 

Resource Controller

 device driver 

from the list, and then press the 

Next

 button. 

 

Figure 3: Device Wizard Driver Selection. 

6.

  If needed, select the 

Relay Delay

 parameter to 

edit the value, and then press the 

Next

 button. 

 

Figure 4: Device Wizard Parameters. 

Содержание 8DO

Страница 1: ...EcoView 8 DO Module 30 minutes for wiring each DO Prerequisites NOTE If the EcoView 8 DO Module will be directly controlling line voltage it must be mounted in an appropriate plastic NEMA enclosure The EcoView Touchscreen is installed and started up according to the Installation Instructions 129 562 A 120 Vac outlet is available for the EcoView 8 DO Module power supply Depending on the type of ins...

Страница 2: ...lease it to display the Configuration screen see Figure 6 2 Press the DEVICE SETTINGS icon 3 Press the Configure tab The EcoView 8 DO Module s MAC address displays in the Unassigned Nodes list See Figure 6 Assigned and unassigned EcoView 8 DO Modules EcoView Multi phase Meters and EcoView Thermostats display in the Configured Device list NOTE Join devices one at a time This minimizes any confusion...

Страница 3: ...Screen Troubleshooting If the EcoView 8 DO Module s MAC address is not displayed on the Device Network screen repeat the steps in the Commissioning the 8 DO Module section Removing Device s Installed to an EcoView Touchscreen in Error Only for Sites with Multiple Touchscreens Use this procedure if the EcoView 8 DO Module has joined the wrong EcoView Touchscreen network 1 Remove the front bezel of ...

Страница 4: ... interference including interference that may cause undesired operation of the device Ce dispositif est conforme à la partie 15 des règles de FCC et aux normes permis exemptes du Canada RSS d industrie L opération est sujette aux deux conditions suivantes 1 que ce dispositif peut ne pas causer l interférence nocive et 2 ce dispositif doit accepter n importe quelle interférence y compris l interfér...

Страница 5: ...ion If this equipment does cause harmful interference to radio or television reception which can be determined by turnings the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit diffe...

Отзывы: