Siemens 8DO Скачать руководство пользователя страница 1

 

 

Installation Instructions 

Document No. 129-565 

April 28, 2015 

 

EcoView™ 8 DO Module Installation and Commissioning

 

 

Item Number 129-565, Rev. CA

 

Page 1 of 5 

This document covers the installation and 

commissioning of the EcoView™ 8 DO Module.  

See the following documents for installation of other 

EcoView system components: 

 

EcoView Touchscreen Installation and System 

Start-up

 (129-562) 

 

EcoView Thermostat Installation Instructions

 

(129-564 or 129-566) 

 

EcoView Multi-phase Meter Installation 

Instructions

 (129-563) 

Product Description 

The EcoView 8 DO Module is an eight-channel, pilot-

duty controller module that is used to manage lighting 

or other energy-consuming electrical loads that would 

benefit from scheduling. Relay channels may be 

accessed through the EcoView Touchscreen or 

remotely through the EcoView Web application. 

Product Number 

57-002  

EcoView I/O Module, 8 DO, with Zigbee, 

includes power supply  

Caution Notations 

CAUTION: 

 

 

Equipment damage or loss of 
data may occur if you do not 
follow the procedures as 
specified. 

Required Tools and Materials 

  Flat-blade screwdriver (1/8-inch blade width) 

  Wire strippers 

Expected Installation Time 

  15 minutes for installing the EcoView 8 DO Module  

  30 minutes for wiring each DO 

Prerequisites 

NOTE: 

If the EcoView 8 DO Module will be directly 
controlling line voltage, it must be mounted in 
an appropriate 

plastic

 NEMA enclosure. 

  The EcoView Touchscreen is installed and started up 

according to the 

Installation Instructions

 (129-562). 

  A 120 Vac outlet is available for the EcoView 8 

DO Module power supply. 

Depending on the type of installation, other 

prerequisites may have to be completed. 

Installation 

 

CAUTION: 

 

Always wear an electro-static discharge 
(ESD) wrist strap and discharge 
accumulated static before touching field 
panel components. 

  Install the EcoView 8 DO Module near the loads 

to be controlled. 

1.  If the EcoView 8 DO Module will be directly 

controlling line voltage, mount the plastic NEMA 

enclosure in the desired location. 

2.  If necessary, install a standard 120 Vac outlet in 

the enclosure where the EcoView 8 DO Module 

power supply will be attached.  

3.  Using the provided screws, mount the EcoView 8 

DO Module assembly in the enclosure. 

4.  Attach the EcoView 8 DO Module 24 Vac power 

supply to the standard 120 Vac outlet and secure 

with the provided plate screw. 

5.  Wire the individual circuits to be controlled to the 

2-pin connectors for Relay 1 – Relay 8. 

NOTE: 

The relays are capable of controlling loads up 
to 240 Vac at 3A. Anything outside of this 
range should be controlled by contactors. 

Содержание 8DO

Страница 1: ...EcoView 8 DO Module 30 minutes for wiring each DO Prerequisites NOTE If the EcoView 8 DO Module will be directly controlling line voltage it must be mounted in an appropriate plastic NEMA enclosure The EcoView Touchscreen is installed and started up according to the Installation Instructions 129 562 A 120 Vac outlet is available for the EcoView 8 DO Module power supply Depending on the type of ins...

Страница 2: ...lease it to display the Configuration screen see Figure 6 2 Press the DEVICE SETTINGS icon 3 Press the Configure tab The EcoView 8 DO Module s MAC address displays in the Unassigned Nodes list See Figure 6 Assigned and unassigned EcoView 8 DO Modules EcoView Multi phase Meters and EcoView Thermostats display in the Configured Device list NOTE Join devices one at a time This minimizes any confusion...

Страница 3: ...Screen Troubleshooting If the EcoView 8 DO Module s MAC address is not displayed on the Device Network screen repeat the steps in the Commissioning the 8 DO Module section Removing Device s Installed to an EcoView Touchscreen in Error Only for Sites with Multiple Touchscreens Use this procedure if the EcoView 8 DO Module has joined the wrong EcoView Touchscreen network 1 Remove the front bezel of ...

Страница 4: ... interference including interference that may cause undesired operation of the device Ce dispositif est conforme à la partie 15 des règles de FCC et aux normes permis exemptes du Canada RSS d industrie L opération est sujette aux deux conditions suivantes 1 que ce dispositif peut ne pas causer l interférence nocive et 2 ce dispositif doit accepter n importe quelle interférence y compris l interfér...

Страница 5: ...ion If this equipment does cause harmful interference to radio or television reception which can be determined by turnings the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit diffe...

Отзывы: