/PERATING INSTRUCTIONS
6%
6
# ' #
'ENERATOR
B
A
"US TIE
BAY
-EASURING
BAY
3YSTEM
INFEED
)SOLATED BAR
3YSTEM BAR
&IGURE #HECKING THE MEASURED VOLTAGES IN THE MEASURING BAY OR SECTION
EXAMPLE
B
A
"US TIE
BAY
-EASURING
BAY
3YSTEM
)SOLATED BAR
3YSTEM BAR
3YSTEM
&IGURE #HECKING THE MEASURED VOLTAGES IN THE MEASURING BAY OR SECTION
EXAMPLE
Содержание 7VE51
Страница 79: ... PPENDIX 6 6 PPENDIX ENERAL DIAGRAMS ONNECTION DIAGRAMS 4ABLES ...
Страница 102: ... PPENDIX 6 6 ...