1
2
3
4
5
6
7
①
Weigh deck
⑤
Load cell
②
Belt
⑥
Shipping bolt
③
Top load cell mount
⑦
Overload bolt
④
Bottom load cell mount
Note
Load cell may appear different than shown.
7.9.2
Installing new load cell
1. Slide the new load cell into position.
2. Install the two bottom load cell mounting bolts and tighten them by hand.
The load cell should now be resting against the overload bolt.
3. Install the two top/front load cell mounting bolts. Tighten them by hand.
4. Start with the bottom load cell mounting bolts and tighten them to the torque value indicated
in the load cell instructions. Now tighten the two top/front load cell mounting bolts to the
same torque value.
Commissioning
7.9 Load cell replacement
SITRANS WW200
Operating Instructions, 06/2018, A5E33560654-AC
23
Содержание 7MH7300 Series
Страница 6: ...Introduction 1 1 The manual SITRANS WW200 6 Operating Instructions 06 2018 A5E33560654 AC ...
Страница 14: ...Calibrating 5 3 Span SITRANS WW200 14 Operating Instructions 06 2018 A5E33560654 AC ...
Страница 30: ...Troubleshooting 9 1 Mechanical troubleshooting SITRANS WW200 30 Operating Instructions 06 2018 A5E33560654 AC ...