Connecting
6
LOAD CELL
"A"
LOAD CELL
"B"
TO
INTEGRATOR
TO
INTEGRATOR
SPEED SENSOR
1
1
1
1
1
1
1
1
2
2
2
2
T
B
1
T
B
4
T
B
3
T
B
5
T
B
7
T
B
2
+
E
X
C
+
EXC
EXC
-
+
E
X
C
-
E
X
C
-
EXC
C
H
/B
C
O
M
+
S
IG
A
+
S
IG
B
+
SI
G
A
+
SI
G
B
EXC
+
C
H
A
S
IG
C
W
-
S
IG
A
-
S
IG
B
-
SI
G
A
-
SI
G
B
C
H
B
C
H
/A
S
IG
C
C
W
S
H
IE
L
D
S
H
IE
L
D
S
H
IE
L
D
S
H
IE
L
D
T
B
6
T
B
8
2
2
2
2
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
5
5
5
5
5
5
5
5
6
6
6
6
6
7
7
7
7
7
6.1
Integrator Wiring Note
Note
For integrator wiring:
Wiring diagram shows connection to BW500 or BW500L. For connection to SIWAREX FTC,
WP241 or WT241 loadcell signals need to be wired in parallel: connect TB4.1 to TB2.5 and
TB4.2 to TB2.6.
SITRANS WW200
Operating Instructions, 06/2018, A5E33560654-AC
15
Содержание 7MH7300 Series
Страница 6: ...Introduction 1 1 The manual SITRANS WW200 6 Operating Instructions 06 2018 A5E33560654 AC ...
Страница 14: ...Calibrating 5 3 Span SITRANS WW200 14 Operating Instructions 06 2018 A5E33560654 AC ...
Страница 30: ...Troubleshooting 9 1 Mechanical troubleshooting SITRANS WW200 30 Operating Instructions 06 2018 A5E33560654 AC ...