background image

IIIInnnnssssttttaaaallllllllaaaattttiiiion 

on 

on 

on IIIInnnnssssttttrrrruuuuccccttttiiiion

on

on

onssss

Document No. 540-219

Rev. 2, January, 1999

Room Pressurization Controller – Pneumatic

Output

P

P

P

Pa

a

a

age 

ge 

ge 

ge 1

1

1

1    o

o

o

of 

f 8

8

8

8

P

P

P

Prrrrodu

odu

odu

oduc

c

c

ct 

t D

D

D

De

e

e

es

s

s

sc

c

c

crrrriiiip

p

p

pttttiiiion

on

on

on

These instructions explain how to field install (pages 1
through 3) or replace (pages 3 through 4) a Room
Pressurization Controller – Pneumatic Output with or
without Autozero Modules.

P

P

P

Prrrrodu

odu

odu

oduc

c

c

ct 

t N

N

N

Nu

u

u

um

m

m

mbe

be

be

berrrr

540-716

Room Pressurization Controller –
Pneumatic Output

540-717

Room Pressurization Controller –
Pneumatic Output with Autozero
Modules

Shipping carton includes a pre-assembled metal
enclosure with controller board and cover, pneumatic
output modules, Autozero Modules with brackets
(optional), and four self-tapping/drilling screws.

IIIIn

n

n

ns

s

s

stttta

a

a

alllllllla

a

a

attttiiiion 

on 

on 

on C

C

C

Con

on

on

onv

v

v

ven

en

en

enttttiiiion

on

on

ons

s

s

s

C

CC

CA

A

A

AU

U

U

UTTTTIIIIO

O

O

ON

N

N

N::::

Equipment damage or loss
of data may occur if the user
does not follow procedure
as specified.

R

R

R

Requ

equ

equ

equiiiirrrred 

ed 

ed 

ed T

T

T

Too

oo

oo

ools

ls

ls

ls

 

Electro-Static Discharge (ESD) wrist strap

 

Small flat-blade screwdriver

 

Medium flat-blade screwdriver

 

Medium-duty electric drill

 

1/4 in. (6.35 mm) hex nut bit

 

Portable Operator’s Terminal with Controller
Interface Software Rev. 2.0 or higher (required
for controller replacement only)

Additional tools needed if not using self-tapping
option:

 

1/4 in. (6.35 mm) hex nut driver

 

1/8 in. (3 mm) bit

P

P

P

Prrrre

e

e

errrrequ

equ

equ

equisi

isi

isi

isitttte

e

e

es

s

s

s

 

Room temperature sensor installed (optional)

 

Air velocity sensors installed in ducts

 

A source of 24 Vac Class 2 power available

 

Supply power to the unit is OFF

 

An air supply line is available at the controller

E

E

E

Ex

x

x

xpe

pe

pe

pec

c

c

ctttted 

ed 

ed 

ed IIIIn

n

n

ns

s

s

stttta

a

a

alllllllla

a

a

attttiiiion 

on 

on 

on T

T

T

Tiiiim

m

m

me

e

e

e

New controller installation

10 Minutes

Replacement (old controller has
removable terminal blocks)

6 Minutes

Replacement (old controller
does not have removable
terminal blocks)

16 Minutes

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::  You may require additional time for database

work at the field panel.

N

N

N

Ne

e

e

ew 

w IIIIn

n

n

ns

s

s

stttta

a

a

alllllllla

a

a

attttiiiion 

on 

on 

on IIIIn

n

n

ns

s

s

str

tr

tr

tru

u

u

uc

c

c

cttttiiiion

on

on

ons

s

s

s

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::  These steps only refer to new installations.

For replacement instructions, refer to pages 3-4. For
Autozero Module installation, refer to instruction 540-
199.

The following tasks can be performed by the
electrician:

1.

 

Loosen, but do not remove, the cover screws and
remove the enclosure cover. Using the rear panel
of the enclosure as a template (Figures 1 and 2),
mark the location for the four screw holes where
you will install the enclosure.

2.

 

Do one

one

one

one of the following:

 

IIIIf 

f u

u

u

us

s

s

siiiing 

ng 

ng 

ng tttthe 

he 

he 

he s

s

s

se

e

e

ellllffff----tttta

a

a

app

pp

pp

ppiiiing 

ng 

ng 

ng s

s

s

sc

c

c

crrrre

e

e

ew

w

w

ws

s

s

s::::  Using the

drill and the hex nut bit, start the screws.
(Screws do not require starter holes.)

 

IIIIf 

f no

no

no

notttt    u

u

u

us

s

s

siiiing 

ng 

ng 

ng tttthe 

he 

he 

he s

s

s

se

e

e

ellllffff----tttta

a

a

app

pp

pp

ppiiiing 

ng 

ng 

ng s

s

s

sc

c

c

crrrre

e

e

ew

w

w

ws

s

s

s::::  Drill four

1/8 in. (3 mm) pilot holes for the screws.
Using the hex nut driver, start the screws.

Содержание 540-716

Страница 1: ... Pr r r re e e er r r requ equ equ equisi isi isi isit t t te e e es s s s Room temperature sensor installed optional Air velocity sensors installed in ducts A source of 24 Vac Class 2 power available Supply power to the unit is OFF An air supply line is available at the controller E E E Ex x x xpe pe pe pec c c ct t t ted ed ed ed I I I In n n ns s s st t t ta a a all ll ll lla a a at t t ti i i ...

Страница 2: ...e application Refer to Figure 6 Refer to Table 1 for application descriptions Run the wiring through knockout C C C CA A A AU U U UT T T TI I I IO O O ON N N N The Controller s Digital Outputs DOs control 24 Vac loads only The maximum rating is 12 VA for each DO For higher VA requirements 110 or 220 Vac requirements separate transformers used to power the load or DC power requirements use an inter...

Страница 3: ...tial values at the field panel If the old controller does not communicate with the field panel but communicates with the CIS or if the controller is stand alone then record the initial values those marked with an asterisk on the CIS display Record these values in Table 3 at the end of these instructions If the old controller is not communicating at all or if the controller you are installing has a...

Страница 4: ...wing If you updated the initial values from the old controller at the field panel then when you set the address and application for the new controller the field panel will automatically send the initial values down to the new controller Once this takes place replacement is complete If you manually recorded the initial values in the table then enter them into the new controller If a field panel is ...

Страница 5: ...ions Rev 2 1 99 Siemens Building Technologies Inc P P P Pa a a age ge ge ge 5 5 5 5 o o o of f f f 8 8 8 8 Landis Division F F F Fi ii igu gu gu gur r r re e e e 3 3 3 3 D D D Di ii im m m men en en ens s s si ii ion on on ons s s s ...

Страница 6: ... Tr r r run un un unk k k k W W W Wi ii ir r r ri ii ing ng ng ng 24 V AC C H DO 1 DO 2 DO 3 DO 4 DO 5 NO C NO C NO C NO C NO C DO 6 DO 7 NO C NO C DO 8 NO C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 COMMON 24 VAC HOT CONTROLLER POWER WIRING NOTE NO EARTH GROUND CONNECTION REQUIRED TEC0047R2 F F F Fi ii igu gu gu gur r r re e e e 5 5 5 5 P P P Po o o ow w w we e e e...

Страница 7: ...or 220 Vac requirements separate transformers used to power the load or DC power requirements use an interposing 220 V 4 relay module TEC Relay Module P N 540 147 N N N NO O O OT T T TE E E E Refer to the unit wiring diagrams or consult with the local representative if terminations are missing or are different 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ROOM TEMPERATURE SENSOR PRESSURE MODE...

Страница 8: ...th an asterisk You may want to make extra copies of this table for other controllers C C C Con on on ontr tr tr tro o o oll ll ll lle e e er r r r n n n na a a am m m me e e e a a a an n n nd d d d l ll lo o o oca ca ca cat t t ti ii ion on on on _________________________________________________________________________ T T T Ta a a ab b b bl ll le e e e 3 3 3 3 R R R Re e e ec c c co o o or r r rd...

Отзывы: