6
Connection and Wiring
Checking Connections
6
- 29
6.5 Checking Connections
Before placing the 2D
-TZ577 Card in service, go through the following checklist to avoid oversights.
Table
6
-
2
Checklist for Proper Connections
No.
Item confirmed
Check
1
Is the 2D
-TZ577 Card securely installed into the Controller's slot?
2
Is the RPOFIBUS Cable linking the 2D
-TZ577 Card to the user's
external equipment properly connected?
3
Is the special
-purpose connector installed at each end of the
PROFIBUS network configured to app
ly terminal resistance as
specified?
4
Is the ferrite core is installed in place?
Содержание 2D-TZ577
Страница 2: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...Feb 2018 MEE Printed in Japan on recycled paper Specifications are subject to change without notice ...