Propeller is fastened correctly to the shaft.
Propeller turns freely in tunnel.
The anode holding screw is tightened well with thread glue.
All electrical wiring, cable sizes and battery capacity is according to the thruster installation manual.
All bolts are securely tightened and sealant are applied as instructed.
Anti-fouling have been applied to the gearhouse and propeller but NOT on the anode or the gearhouse lid where the pro-
peller is fastened.
Correct drive direction as per controlpanel.
All electrical connections are clean, dry and tight, and the correct cable, fuse and main switch sizes have been used.
The bolts holding the gearhouse and motorbracket together are tightened correctly.
Very important for IP protection:
The main power cables have securely been connected as described.
The control lead ends out of the explosive area and has been properly fitted and secured against damage.
The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.
Signed: ..................................... Date: .......................................
Extra pre-delivery tests by installer / yard who does not use other quality control systems !
Thruster type: ................................................. Voltage: ......................
Serial number: .....................................................................................
Date of delivery: ..................................................................................
Correct drive direction as per control panel: .......................................
Voltage at thruster when running: ......................................................
Battery cable size used: .....................................................................
Other comments by installer: