
20
The installation steps of the main power module are as follows:
1. Insert the AC input and DC output of the cabinet into the corresponding module position;
2. Fix the module to the cabinet through the fixing holes on the upper and lower front panel of
the module;
NOTE!
After the module is installed in the system, please set the address of the
module as "- -01", "- -02", "- -03" and so on in order from left to right.
3.9 After the initial setup boot
Before the system boot, check whether the module is installed, whether the AC input wiring is
correct, after all the preparations are completed, turn on all the switches, a module address bits
are set in accordance with 5.2 after power, and the background set in accordance with 8.1.
3.10 Charging status indicator
With luminous and indicating function, the charger is convenient for customers to conduct
charging operations at night. Three-color indicator: red, yellow, green.
1) Red light indicates fault and alarm status; it will not light on when charger work normally.
2) Yellow light indicates the load is charging.
3)Green light indicates that the battery is fully charged; the charger is in standby mode.
3.11 Emergency stop button
There’s emergency stop button above card billing area. When the charger fails, user can press
the emergency stop button, which make the charger output disconnected, meanwhile the
indicator light keeps to be red. After corresponding troubleshooting, the emergency stop button
will restore by rotated to the right.
Содержание EVMS Series
Страница 1: ...1 Electric Vehicle Charging Station EVMS 150 2021 V1 0 USER MANUAL ...
Страница 12: ...12 3 4 Appearance Front View 1 2 3 5 4 ...
Страница 17: ...17 3 6 Charger diagram ...