Well sounders «DU-1»
11. MAINTENANCE
11.1. Order of Well sounder Maintenance
Type of works
Maintenance
1 (every
week)
Maintenance
2
(every
month)
Maintenance
3
(every 6
months)
Maintenance
4
(every 12
months)
Cleaning of
the tapered
connecting
thread, the
acoustic
sensor, the
well sounder
and the case
+
+
+
+
Maintenance
of the exhaust
valve
-
+
+
+
Cleaning of
accumulator
charging
socket
-
+
+
+
Performance
monitoring
1)
-
-
+
+
Pressure tests
1)
-
-
+
+
Replacement
of the valve
sealing ring
-
-
-
+
11.2. Procedure of Well sounder Maintenance
11.2.1. Cleaning Tapered Connecting Thread, Acoustic Sensor,
Well sounder and Sensor Case
Содержание DU-1
Страница 2: ...Well sounders DU 1...