Shyam HB-20 Series Скачать руководство пользователя страница 23

 

Next Generation  
Signal Enhancement

 

 
For Customer Use Only …….. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Technical Support 

 
For further information on the product, not prescribed in this publication, please 
contact our helpdesk: 
 

SHYAM Telecom Ltd. 

246,Phase-4,Udyog Vihar ,Gurgaon, Haryana-122015  (INDIA) 
Tel: + 91-124-4311600-09   Fax: +91-124-4018117  
                
                      An on line service using our Internet site is available. 
                     Web: http//www.shyamtelecom.com 

                             e-mail: T

[email protected]

T

 

 File 

Doc. No. 

             Date 

 Version 

Page 

HB-20 

5700 9004 050 

Mar,06 

 2.0 

23 

 

 

 

Содержание HB-20 Series

Страница 1: ...prietary to Shyam Telecom Limited Unauthorized access copy and replication is prohibited Use or disclosure of this document or the information contained herein for any purpose other than that for whic...

Страница 2: ...er the sale A result ensured by an annual R D budget of US 5 million and the best R D center in its category award by department of Scientific Industrial Research DSIR Government of India Shyam today...

Страница 3: ...y part of the system b If serial number of system is tempered with c If repair service modification was done by an unauthorized person d Defects arising out of circumstances beyond control like lightn...

Страница 4: ...returning the goods the customer should give prior notice to Shyam Telecom through normal return authorization procedure Shyam Telecom aims to offer an excellent service To do that we ask our customer...

Страница 5: ...of Installation Kit 10 SECTION 4 11 4 1 System Design and Setup 11 SECTION 5 12 5 1 Installing the HB 20 12 5 2 Installation Tools 12 5 3 Installation Procedure Do It Yourself 12 5 4 Power Startup Al...

Страница 6: ...hould be taken into service without any complications and should operate trouble free for a long time However we have country wide after sales support network to assist you if required Please visit to...

Страница 7: ...to install the HB 20 system should comply with national or local governing Electrical Codes Indoor RF coaxial cable installations should comply with local Electrical Code requirements The HB 20 boost...

Страница 8: ...ntial homes Outdoor areas are degraded by geographic topologies such as mountains valleys dense foliage and high rising urban landscapes which can easily degrade or obstruct the cell site s signal fro...

Страница 9: ...lding so as to receive the maximum forward signal level from the base station The indoor antenna of HB 20 booster provides RF signal in all directions downward and outward from the installation point...

Страница 10: ...Antenna Optional 7 dbi 2 Server Antenna Whip Antenna Optional 0 dbi 3 RF coaxial cable with SMA to SMA M connector Optional 4 Booster HB 20 5 AC DC Adapter 9VDC 2 0 Amp 6 Mounting Kit 7 Installation a...

Страница 11: ...ues and materials The system design is quite simple straightforward The signal from the base station of the selected Operator is picked up preferably on the rooftop The built in receive signal level i...

Страница 12: ...mmodation for the indoor antenna providing line of site coverage to as much of the coverage area as possible 5 2 Installation Tools You will only need the standard wrenches hammer screwdrivers pliers...

Страница 13: ...eading or stripping The RF connections should be snug and tight iii Seal the outdoor connectors with waterproof sealant such as M seal or the appropriate weather tight boot 5 4 Power Startup Alarm Che...

Страница 14: ...elecom com 4 Review the intended coverage area according to the site installation plan Using a mobile NOKIA handset loaded with NET engineering software and the SIM card of cellular operator measure a...

Страница 15: ...glow when the downlink power is more than the desired level The systems will shutdown the PA and then restart after 30 seconds Downlink RSSI is monitored continuously and display through 3 LED s U L A...

Страница 16: ...ame Nominal Gain 65 dB Automatic Gain adjustment 31 dB steps of 1 dB Auto Power Control range 10 dBm DL Power Output 10 dBm Composite UL Power Output 10 dBm Composite Inter Modulation Products two ton...

Страница 17: ...r 9V DC 2 Amp AC100 240V 50 60 Hz RF Connector Donor and Server Antenna SMA F TYPE Dimensions HxWxD approx 86 x 170 x 40 mm Weight Approx 0 8 Kg Operating Temperature Range 5o C 55o C File Doc No Date...

Страница 18: ...antenna will cause system oscillation and it may damage the amplifier of the booster It is to note that the booster gain should be at least 10 db lower than the antenna isolation C The system perform...

Страница 19: ...the booster installation or site survey If so adjust the gain of booster or re align the server antenna without affecting the existing coverage D Alarm indication LED will glow in red colour It indic...

Страница 20: ...econfiguration or programmability of the device shall only be made available to service depots and agents of the equipment supplier and NOT to the public 4 Exposure of Humans to RF Field The equipment...

Страница 21: ...Next Generation Signal Enhancement Typical Product Application Farm House File Doc No Date Version Page HB 20 5700 9004 050 Mar 06 2 0 21...

Страница 22: ...Next Generation Signal Enhancement Typical Product Application In Basement File Doc No Date Version Page HB 20 5700 9004 050 Mar 06 2 0 22...

Страница 23: ...publication please contact our helpdesk SHYAM Telecom Ltd 246 Phase 4 Udyog Vihar Gurgaon Haryana 122015 INDIA Tel 91 124 4311600 09 Fax 91 124 4018117 An on line service using our Internet site is a...

Отзывы: