SHYAM Networks RM-1C-18M-19-24 Скачать руководство пользователя страница 4

NETWORKS

4

RM24/58

2. Installing RM24/58

Additional Hardware

• 

RJ-45 crimp tool (if pre-assembled cable is not used)

• 

Grounding cable

• 

13 mm or 

½

½ socket spanner

• 

Ethernet cable - outdoor class, CAT-5e, and 4 twisted pairs

• 

Cable ties

• 

Computer/laptop running Windows XP/Windows 7

Installation Sequence 

Mount RM24/58

STEP 1

   Assemble RM24/58 unit onto the mast.

STEP 2

   Connect the ground cable to the chassis point on RM24/58.

STEP 3

   Attach cable from RM24/58 to the RJ-45 connector.

STEP 4 

Secure the cables to the mast or brackets using UV-rated cable ties.

STEP 5 

Repeat the procedure to mount the other RM24/58 at the slave site.

Mount  

RM24/58

Ground  

RM24/58

Align Master 

and Slave 

RM24/58

Connect 

RM24/58 to 

PoE Injector

Supply  

Power to  

PoE Injector

PoE Adapter

4-Port Switch

Integrated Antenna

Содержание RM-1C-18M-19-24

Страница 1: ...settings and more detailed information download the user manual from www shyamnetworks com Package Contents RM24 58 1 Mast Wall Mounting Kit 1 Outdoor Ethernet Cable Optional 1 External Antenna Option...

Страница 2: ...RM 1C 100M 19 24 2 4 GHz 100 Mbps with integrated 19 dBi antenna RM 1C 100M E 24 2 4 GHz 100 Mbps with external antenna RM 1C 18M 23 58 5 8 GHz 18 Mbps with integrated 23 dBi antenna RM 1C 18M E 58 5...

Страница 3: ...he alignment process of the antenna is complete Check that there are no direct obstructions or interferences in front of RM24 58 when installing it Do not stand in front of a connected RM24 58 as it r...

Страница 4: ...unt RM24 58 STEP 1 Assemble RM24 58 unit onto the mast STEP 2 Connect the ground cable to the chassis point on RM24 58 STEP 3 Attach cable from RM24 58 to the RJ 45 connector STEP 4 Secure the cables...

Страница 5: ...r supply RM24 58 starts receiving power through the PoE adapter Align Master and Slave RM24 58 STEP 1 Turn on the power supply of the PoE injector at both the sites STEP 2 Align master RM24 58 in the...

Страница 6: ...system to the LAN STEP 3 Double click the Shyam Transmission System icon on the desktop or click Start Programs Shyam Transmission System STEP 4 Enter username and password as admin STEP 5 Connect RM2...

Страница 7: ...ty between the external antenna and RM24 58 Check master and slave RM24 58 alignment After setting to factory defaults check that both master and slave sites have same SSID and pass phrase for the rad...

Страница 8: ...o 6 months from the date of purchase of the product 4 In case of a problem with your unit please contact Customer Care In the event that you are advised to send and collect the unit from the Service C...

Отзывы: