
19
(2) Operation Check
Before operating the generator, check always
if the device can work.
Ensure that the breakers and the
Switches of loads are positioned
to OFF.
Ensure every breaker to set OFF.
Refer to
『
4-2.Operation Panel
』
and
『
4-3.Output Panel
』
Following the procedure in 9-1,
Initialization and Preparation,start an engine.
Turn every breaker and ELCB to ON.
Push the RESET (Green) button on
the 1-Phase ELCB.
Confirm the red lamp on the 1-Phase
ELCB turned ON and the indicator on
the 3-Phase ELCB turns RED display.
Push the TEST button (Yellow) on 3-Phase
ELCB.
Indicator changes to Green from RED
and ELCB trips to OFF, Which shows
NORMAL.
Push the TEST button (Blue) on 1-Phase ELCB.
Red lamp turns to OFF and ELCB trips to OFF,
Which shows NORMAL.
In the event you cannot complete every step of the above procedure to the end,
the device is out of order. Consult with our authorized distributor or our engineering
section and ask to repair.
WARNING : Electric Shock / Injuries
Before turning Breaker or ELCB to ON position,
ensure that the breakers or the switches of loads are positioned to OFF.
You should communicate well with the electrician by the load side
when operating Breaker or ELCB.
1
3
2
4
Test button (Yellow)
Indicator
3-Phase ELCB
5
RESET button (Green)
TEST button (Blue)
Lamp
1-Phase ELCB
6
Main Breaker
3-Phase Breaker
1-Phase Breaker
Battery Isolator
Содержание DGA20EM
Страница 2: ......
Страница 48: ...44 13 Generator Circuit Diagram ...
Страница 49: ...45 14 Engine Circuit Diagram ...
Страница 50: ......
Страница 51: ......
Страница 52: ... 2020 ...