background image

 

  

 

 

   

 

Ordercode: 60407 

Mirrorball 50 cm 

Installation 

Remove all packing materials from the Mirrorball 50 cm. Check if all foam and plastic padding is 
removed. Connect all cables. 

Do not supply power before the whole system is set up and connected properly. 
Always disconnect from electric mains power supply before cleaning or servicing. 
Damages caused by non-observance are not subject to warranty. 

 
 

Set Up and Operation 

Follow the directions below, as they pertain to your preferred operation mode. 
Before plugging the unit in, always make sure that the power supply matches the product specification 
voltage. Do not attempt to operate a 120V specification product on 230V power, or vice versa. 
Connect the device to the main power supply. 
 

 

The motor must be installed in a horizontal position at a vibration-free, oscillation-free and fire-
resistant location. Use a water-level to make sure that the motor is installed absolutely horizontally 
and that the motor axle points are facing the bottom. 

 

If the motor and the mirror ball are to be operated above persons, a hazard analysis based on the 
location and application must be performed in order to ensure dimensioning and measures for a 
safe operation. Both the motor and the mirror ball meet the professional safety regulations regarding 
safety and operation. 

 

The installation of the mirror ball has to be carried out in a way that it can hold 10 times the device’s 
weight for 1 hour, without any harming deformation. 

 

The installation must always be secured with a safety attachment, constructed in a way that no part 
of the installation can fall down if the main attachment fails. 

 

When rigging, derigging or servicing the fixture, staying in the area below the installation place, on 
bridges, under high working places and other endangered areas is forbidden. 

 

The operator has to make sure that safety-related and machine-technical installations are approved 
by an expert before taking into operation. 

 

The operator has to make sure that safety-related and machine-technical installations are approved 
by an expert after every four years in the course of an acceptance test. 

 

The operator has to make sure that safety-related and machine-technical installations are approved 
by a skilled person once a year. 

 

Installing the Mirrorball Motor 

01)

 

The fixation holes are located on the baseplate. 

02)

 

Hold the baseplate onto the location where the device is to be installed. 

03)

 

Mark the holes with a pen or a suitable tool. 

04)

 

Drill the holes. 

05)

 

Hold the baseplate in the desired position and fit it to the ceiling, by tightening the screws. 

 

 

The chain must never be longer than 100 cm. 

 

Install the mirror ball chain with the screw-on chain link at the installation eyelet of the mirror ball and 
tighten the fixation screw. 

 

Insert the fourth chain link of the mirror ball chain with the mirror ball in the screw-on chain link and 
tighten the fixation screw. 

 

For overhead use, always install a safety chain on the mirror ball, which can hold at least 12 times the 
weight of the installation. The safety chain must be slightly longer than the mirror ball chain, so that 
the safety chain remains tension-free. Pull the safety chain through the safety eyelet of the mirror ball 
and through the safety eyelet of the motor. 

 

The maximum drop distance must never exceed 20 cm. 

 

A safety chain which already held the strain of a crash or which is defective, must not be used again 
and should be replaced. 

 

There must never hang a mirror ball or other load at the safety eyelet. Loads must only be hung at 
the quick link of the installation eyelet, at the motor axle. If, for any reason, a mirror ball hangs at the 
safety eyelet, the motor must be taken out of operation immediately and the mirror ball must be 
uninstalled. The whole installation has to be checked for defects by an expert. 

 

Make sure that the rotation of the mirror ball is never obstructed by decoration material etc. 

Содержание 60407

Страница 1: ...Mirrorball 50 cm V1 Highlite International B V Vestastraat 2 6468 EX Kerkrade the Netherlands Ordercode 60407 MANUAL ENGLISH...

Страница 2: ...ng Determinations 4 Rigging 4 Connection with the mains 4 Return Procedure 5 Claims 5 Description of the device 6 Features 6 Overview 6 Installation 7 Set Up and Operation 7 Installing the Mirrorball...

Страница 3: ...x and packing Your shipment includes Showtec Mirrorball 50 cm User manual Safety Instructions Every person involved with the installation operation and maintenance of this device has to be qualified f...

Страница 4: ...or ball and the motor should be hung and operated absolutely vibration free Regularly examine whether the keyring or the chain has any deformations If you find any immediately detach the mirror ball T...

Страница 5: ...ceiling or high joists professional trussing systems have to be used Use a clamp to mount the pinspot with the mounting bracket to the trussing system The pinspot must never be fixed swinging freely i...

Страница 6: ...mber 04 A brief description of the symptoms Claims The client has the obligation to check the delivered goods immediately upon delivery for any short comings and or visible defects or perform this che...

Страница 7: ...sories 42402 LED Pinspot silver 42403 LED Pinspot black 60411 Mirrorball Motor until 40 50 cm 1 RPM 60449 Mirrorball Motor DMX 2 channel max 5 RPM D7442B Roadcase for 50 cm Mirrorball Overview Fig 01...

Страница 8: ...ed and machine technical installations are approved by an expert before taking into operation The operator has to make sure that safety related and machine technical installations are approved by an e...

Страница 9: ...o be considered during the inspection 01 All screws used for installing the device or parts of the device have to be tightly connected and must not be corroded 02 There may not be any deformations on...

Страница 10: ...Model Showtec Mirrorball 50 cm Dimensions 50 cm Weight 6 6 kg Max ambient temperature ta 5 C 40 C Max housing temperature tB 80 C Design and product specifications are subject to change without prior...

Страница 11: ...10 Ordercode 60407 Mirrorball 50 cm...

Страница 12: ...2017 Showtec...

Отзывы: