background image

Specifications subject to change without notice                           THE FOLLOWING:
due to continuing product improvement                                        DO NOT USE Z-WAVE DEVICES TO CONTROL ELECTRIC HEATERS OR ANY OTHER
Website www.ishowlights.com                                                     APPLIANCES WHICH MAY PRESENT A HAZARDOUS CONDITION DUE TO UNATTENDED OR
                                                                                                     UNINTENTIONAL OR AUTOMATIC POWER ON CONTROL.

1. Getting To Know Your New Z-Wave Device

Turn ON/OFF manually or remotely via the Z-Wave controller

 Can be Included in multiple Groups and Scenes

 Compatible with all incandescent and CFL/ LED bulbs

 Z-Wave Certified for simple pairing and integrated home automation

 Screw Terminal Installation 

 requires wiring connections for Line (Hot), Load, Neutral.

WARNING 

 SHOCK HAZARD

Turn OFF the power to the branch circuit for the switch and lighting fixture at the service panel. All wiring 

connections must be made with the power OFF to avoid personal injury and/or damage to the switch.
 
A. Up Push button
B. Down Push button
C. Nutral (White) - Nutral in 
D. Line (Black) - Line in
E. Load (Black) 

 

Single switch wiring

Single switch wiring

1. Shut off power to the circuit at circuit breaker or fuse box.

   IMPORTANT! Verify power is OFF to switch box before continuing.

2. Remove wall plate.
3. Remove the switch mounting screws.
4. There are up to three screw terminals on the switch; these are marked
    C. Nutral 

 White(Nutral) 

    D. Line  

 Black (connected to power)

    E. Load 

 Black (connected to lighting)

5. Observe Important Wiring Information

 

 IMPORTANT!:

 This switch is rated for and intended to only be used with copper wire. Wire Gauge Requirements

  Use larger wires suitable for at least 80

°

 C for supplying Line (HOT), Load, Neutral connections.

  Wire strip length:

  For attachment to screw terminals: Strip insulation 1" ,  For attachment using the enclosure

s holes:

  Strip insulation 5/8".
6. Connect the black wire that goes to the light to the terminal marked Load.
7. Connect the black wire that comes from the electrical service panel (Hot) to the terminal marked Line.

8. Connect the white wire to the neutral terminal marked Nutral (use jumper wire if needed).
9. Insert Switch into the switch box being careful not to pinch or crush wires.
10. Secure the Switch to the box using the supplied screws.
11. Mount the wall plate.
12. Reapply power to the circuit at fuse box or circuit breaker and test the system.

Basic Operation

Отзывы: