Specifications subject to change without notice THE FOLLOWING:
due to continuing product improvement DO NOT USE Z-WAVE DEVICES TO CONTROL ELECTRIC HEATERS OR ANY OTHER
Website www.ishowlights.com APPLIANCES WHICH MAY PRESENT A HAZARDOUS CONDITION DUE TO UNATTENDED OR
UNINTENTIONAL OR AUTOMATIC POWER ON CONTROL.
1. Getting To Know Your New Z-Wave Device
Turn ON/OFF manually or remotely via the Z-Wave controller
•
Can be Included in multiple Groups and Scenes
•
Compatible with all incandescent and CFL/ LED bulbs
•
Z-Wave Certified for simple pairing and integrated home automation
•
Screw Terminal Installation
—
requires wiring connections for Line (Hot), Load, Neutral.
WARNING
—
SHOCK HAZARD
Turn OFF the power to the branch circuit for the switch and lighting fixture at the service panel. All wiring
connections must be made with the power OFF to avoid personal injury and/or damage to the switch.
A. Up Push button
B. Down Push button
C. Nutral (White) - Nutral in
D. Line (Black) - Line in
E. Load (Black)
Single switch wiring
Single switch wiring
1. Shut off power to the circuit at circuit breaker or fuse box.
IMPORTANT! Verify power is OFF to switch box before continuing.
2. Remove wall plate.
3. Remove the switch mounting screws.
4. There are up to three screw terminals on the switch; these are marked
C. Nutral
—
White(Nutral)
D. Line
—
Black (connected to power)
E. Load
—
Black (connected to lighting)
5. Observe Important Wiring Information
IMPORTANT!:
This switch is rated for and intended to only be used with copper wire. Wire Gauge Requirements
Use larger wires suitable for at least 80
°
C for supplying Line (HOT), Load, Neutral connections.
Wire strip length:
For attachment to screw terminals: Strip insulation 1" , For attachment using the enclosure
’
s holes:
Strip insulation 5/8".
6. Connect the black wire that goes to the light to the terminal marked Load.
7. Connect the black wire that comes from the electrical service panel (Hot) to the terminal marked Line.
8. Connect the white wire to the neutral terminal marked Nutral (use jumper wire if needed).
9. Insert Switch into the switch box being careful not to pinch or crush wires.
10. Secure the Switch to the box using the supplied screws.
11. Mount the wall plate.
12. Reapply power to the circuit at fuse box or circuit breaker and test the system.
Basic Operation