
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
0004597
Page 9 of 14
Rev E 11/17/2016
The following picture shows the position of the level cable as it comes over the pulley in the
cradle tube and out the bottom to go to the corner cable bracket attached to the corner of the
lower frame. Note the other hole on the end of the cradle tube will be used later to attach the
cables coming from the bottom of the lift tube.
Step #9
– Attach the Level Cable
Attach the level cable as shown inserting the cable into the hole closest to the sideframe and
securing with a flat washer and 2 brass hex nuts. The first nut will be run to the bottom of the
threads and the second run down and secured tightly against the first. Repeat on other level
cable.