Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorestation.com
0004405
Page 10 of 12
Rev B 11/05/2013
Hoist Dock Mount Kit ShoreBridge
Slide square u-bolts from the inside out on the
curved truss of the Shorebridge dock section locating
them so they will insert into the holes on each end of
the dock mount tube. Place a 3/8” lock washer over
the threaded end of the u-bolt inside the tube and
secure with a 3/8” hex nut. Repeat on the other leg
of the u-bolt and on the u-bolt on the other end.
Level the tube and tighten securely.
Insert the 3/8 X 1” carriage bolts thru the winch post
mounting channel and thru the hoist attaching plate
and
then thread on a 3/8” flange lock nut to hold in
place.
Slide the channel assembly over the tube that is
mounted on the dock and align the holes in the
channel with those in the tube. Insert the 3/8 X 3 1/4”
hex bolts into the holes.
Slide the lift into position and insert the flanges of the
winch post extrusion behind the hoist attaching
plates. Position the lift for proper water depth and
tighten the flange lock nuts so that the winch post
extrusion is tightened in position securely.
Check to make sure that all fasteners have been
tightened securely and that all adjustments have been
made.
Insert the black plastic caps into the ends of the tube
and assembly is complete.