background image

Midwest Industries, Inc.        Ida Grove, IA 51445              800-859-3028                      

www.shorelandr.com

          

0004224  

Page 

of 

11 

          8/17/2010

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание SLB14TL Series

Страница 1: ...1 or 65537 Tongue 3X3X14 GA X 8 6 1 or 65516 Tongue 3X3X14 GA X 10 1 Check with your dealer customer service representative for current tire rim assembly part number ShoreLand r offers their product line a painted finish When ordering parts it is important that you specify the finish or color you have on your product The five 5 digit number along with a two 2 digit space _ _ note the parts which c...

Страница 2: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorelandr com 0004224 Page 2 of 11 8 17 2010 ...

Страница 3: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorelandr com 0004224 Page 3 of 11 8 17 2010 ...

Страница 4: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorelandr com 0004224 Page 4 of 11 8 17 2010 ...

Страница 5: ...ed on shipping weight of the trailer with standard equipment Adding optional equipment may decrease the trailer s carrying capacity Tire Size and Carrying Capacity Chart Tire Size 5 30 X 12 C GVWR 2000 lb Carrying Capacity 1400 lb Axle Non Brake Refer to the tire side wall for correct tire pressure NOTE Brakes available as optional equipment ...

Страница 6: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorelandr com 0004224 Page 6 of 11 8 17 2010 ...

Страница 7: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorelandr com 0004224 Page 7 of 11 8 17 2010 ...

Страница 8: ...and the white ground wire out the hole They will be attached later once the tongue is installed in the frame Look at the bottom side of the tongue and locate the slotted key slot hole in the tongue Note that one end of the tongue stand has a dart or arrow shaped end With the tongue stand positioned 90 degrees to the centerline of the tongue insert the dart or arrow end of the tongue stand into the...

Страница 9: ... front spring eyes align with the front holes in the spring bracket Insert a 9 16 x 3 1 4 hex bolt and secure with a 9 16 lock nut Tighten Tighten the U bolt attaching the springs to the axles at this time and any other bolts that may have been left loose for ease of assembly Place the tire and wheel assemblies on the hubs and secure with the 1 2 tapered lock nuts Tire and Wheel Assemblies Mount t...

Страница 10: ...best loading the bunk assemblies will be positioned just to the outside of a strake This will help center the boat as it is loaded Once the desired positioning is achieved tighten the nuts on the U bolts securing the fishing series bunk brackets to the cross members Keel Roller Check the front of the boat for clearance between the frame and tongue The keel roller has slotted holes so they can be a...

Страница 11: ...been achieved tighten all fasteners that may have either been left loose or have been loosened to do the adjusting Note All nuts and bolts must be tightened before towing The law requires that the white ground wire on both the tongue wire harness and vehicle harness be properly grounded to respective trailer and vehicle frames Re check all fasteners on the complete trailer to make sure they are al...

Отзывы: