![SHOR-LINE Kat Play-Around Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/shor-line/kat-play-around/kat-play-around_manual_1259605021.webp)
{21}
Shor-Line | 800.444.1579 |
www.shor-line.com
Installing the Lower Shelf Weldment on Left Side Panel
Step 1
A support tube is installed within the layers of the side
panels to support the lower shelf assemblies. Using a
tape measure, measure 18 ⅞
"
up from the bottom of
the Side Panel. See Fig. 18.
Step 2
Insert a #12x2
"
TEK HX HD screw in the back of
the Lower Shelf Weldment and into the Side Panel
to secure. See Fig. 19 below.
Step 3
Using a carpenter’s level, make sure the shelf is level
before installing the other two screws in the back of
the Shelf Weldment.
Step 4
Again, using the carpenter’s level, raise shelf up until
level and place a #12x2
"
TEK HX HD screw in the
pre-drilled hole in the corner of the shelf weldment
and into the Back Panel to secure.
LOWER
SHELF
WELDME
NT
18 7/8" UP FROM
THE BOTTOM OF
THE SIDE PANEL
(GATE PANEL AND DOOR REMOVED FOR CLARITY)
Fig. 18
AE
DETAIL AE
SCALE 1 : 1.5
SIDE
PANEL
BACK
PANEL
SHELF
WELDMENT
#12X2" TEK HX
HD SCREWS
(GATE PANEL AND DOOR REMOVED FOR CLARITY)
Fig. 19
LOWER
SHELF
WELDME
NT
18 7/8" UP FROM
THE BOTTOM OF
THE SIDE PANEL
(GATE PANEL AND DOOR REMOVED FOR CLARITY)
LoWEr SHELF
WELDmEnt