background image

 

15 

SECTION 5: SHOR-LINE CUSTOMER INFORMATION

 

V. RECEIVING AND INSPECTING SHIPMENTS

 

 

 

 
 

INTRODUCTION 

When preparing for transport, Shor-Line and a carrier inspected 
product  quality  and  count.    Because  problems  occur  during 
transit,  Shor-Line  offers  you  best  practices  for  receiving, 
inspecting, and unpacking your merchandise. 

Please  help  us  file  claims  and  protect  yourself  by  applying  the 
following  practices.   

Failure  to  concur  can  result  in  you 

owning damaged products. 

Important: 

  After  fifteen  (15)  calendar  days  of  receipt  of  merchandise, 

Shor-Line’s  FREIGHT  CLAIM  &  PRODUCT  RECOVERY 
POLICY becomes void.  

A) AT TIME OF DELIVERY 

1. 

VERIFY  COUNT

  -  Check  the  number  of  pieces  (shipping 

containers, cartons, etc.) received against the number listed 
on carrier’s delivery receipt (i.e. Bill of Lading).

 

 

If no discrepancy:  

  Go to: 2. INSPECT CONTAINERS FOR DAMAGE 

If discrepancy (shortage):

  

  Write  the  number  of  pieces  not  delivered  AND  number  of 

pieces delivered on all copies of delivery receipt. 

  Confirm  the  shortage  by  having  driver  sign  all  copies  of 

the delivery receipt. Retain a copy to file a claim for loss. 

  Initiate carrier inspection and recovery processes: 

  lf Shor-Line’s carrier delivered freight, call our Shor-Line 

Technical  Services  Department  immediately  and  we’ll 
replace missing freight. 

  lf  customer-selected  carrier  delivered  freight,  contact 

carrier and initiate inspection and claim processes. 

2. 

INSPECT  CONTAINERS  FOR  DAMAGE

  -  Thoroughly 

examine each shipping container for visible damage.   

If no visible damage

 (containers are not crushed, torn, wet, 

or otherwise damaged): 

  Accept  the  shipment,  retain  copy  of  delivery  receipt,  and 

continue  to  next  page:  B)  AFTER  ACCEPTANCE  OF 
FREIGHT 

lf minor visible damage: 

  Describe  damage  to  container(s)  in  detail  AND  write 

“subject  to  damages  discovered”

  on  all  copies  of  delivery 

receipt.  This is critical for freight claims. 

  Confirm  your  notation  by  having  driver  sign  all  copies  of 

the delivery receipt. 

  Accept  the  shipment,  retain  copy  of  delivery  receipt,  and 

continue  to  next  page:  B)  AFTER  ACCEPTANCE  OF 
FREIGHT 

 

2. 

INSPECT CONTAINERS FOR DAMAGE

 

- continued 

lf severe visible damage:

 

  Write  the  number  of  containers  damaged  and  describe 

damage to container(s) on all copies of delivery receipt. 

 

Ask  driver  to  inspect  merchandise  with  you

  and  open 

container immediately.  If driver will not inspect freight and 
leaves premise,  

  Write 

“Driver  will  not  inspect  merchandise”

  AND 

“Subject  to concealed damage”

 on all copies of delivery 

receipt. 

  Have the driver sign to confirm your notation and keep a 

copy of the delivery receipt to file a claim. 

  Continue  to  next  page:  B)  AFTER  ACCEPTANCE  OF 

FREIGHT 

  Describe,  in  detail,  all  visible  damage  to  merchandise  on 

all copies of delivery receipt. 

  Write 

“Subject  to  damages  discovered”

  on  all  copies  of 

delivery receipt

 

and sign. 

  Have the driver sign to confirm your notation on all copies 

of delivery receipt.  

  Keep a copy of the delivery receipt to file a claim. 

  Initiate carrier inspection and recovery processes: 

lf Shor-Line’s carrier delivered freight: 

  Call  our  Shor-Line  Technical  Services  Department 

immediately  and  we’ll  replace  or  fix  product  to  your 
satisfaction.    Our  team  will  coordinate  product  return 
and/or  repair  pursuant  to  our  PRODUCT  RETURN 
POLICY and PRODUCT REPAIR POLICY. 

  We’ll request documentation from you, coordinate future 

site  inspection  with  carrier,  and  prepare  you  for  site 
inspection.    Reference  next  page:    C)  SUPPORT 
DURING SITE INSPECTION. 

lf customer-selected carrier delivered freight: 

  Decide  if  you  want  to  accept  or  reject  the  entire 

shipment.  You may have the option to accept and reject 
parts of the shipment.  Speak with carrier.* 

  Write the number of pieces you accept AND number of 

pieces you reject on all copies of delivery receipt. 

  Contact  carrier  and  initiate  inspection  and  claim 

processes. 

  Continue to next page. 

 

If the carrier abandons the merchandise (fails or refuses 
to return shipment), consult your legal counsel regarding 
disposition. 

Содержание CAT CONDO

Страница 1: ...0 444 1579 or 913 281 1500 Fax 913 281 5339 Web www shor line com E Mail contact shor line com SHOR LINE LIMITED Vale Business Park Llandow Cowbridge Vale of Glamorgan CF71 7PF Wales United Kingdom Ph...

Страница 2: ...2...

Страница 3: ...ding area Installation is quick and easy For your safety and overall satisfaction it is important that you read and follow these instructions This manual provides information on Description Page SECTI...

Страница 4: ...investment for years to come If you have questions experience difficulty or interested in other Shor Line products contact us Our Technical Service Department stands ready to assist SHOR LINE Schroer...

Страница 5: ...mbly can be done on top of cardboard thus protecting the laminated units from possible scratching 5 Use the Materials List to ensure nothing has been lost or damaged during shipping If Shortage Docume...

Страница 6: ...Bolts 2 Insert Plastic Dowels into the Platform s pre drilled holes 3 Per your design position Bottom Row Condo Units onto Platform Plastic Dowels Ensure Horizontal Portholes align Note The outer pan...

Страница 7: ...Required Shor Line Platform Deck s Casters 20 x Bolts Caster 20 x Bolt Step 1 Turn the Platform Deck onto its back side Figure 2 2 Place Casters over the Platform s pre drilled holes and attach using...

Страница 8: ...l position Lift Platform and insert Legs into Level Caps 4 Adjust Leveling Screws to level the Platform Step Optional 5 Kickplates attach to Legs and keep dust and animals from getting under the Condo...

Страница 9: ...have pre drilled holes that Plastic Dowels fit into to keep Condo Units in place Use a Rubber Mallet to tap Dowels into place Failure to use the Dowels Barrel Nuts and Screws can result in Condos shi...

Страница 10: ...7 and 9 will NOT have Horizontal Portholes on the outside only those facing inside the system Inside Condos 2 5 and 8 must have corresponding Vertical Plug Hole and Horizontal Portholes that join con...

Страница 11: ...o the Platform making sure the holes of the Condo Unit align with the Platform s Dowels 7 Insert Barrel Nuts into the pre drilled holes on the side panel of the unit you ve positioned and add the next...

Страница 12: ...ith fresh water Dry completely with a soft cloth to discourage water spotting 1 Laminated Side and Top Panels continued Non oily furniture spray can be used keep surfaces beautiful and to help hide an...

Страница 13: ...en 15 calendar days of receipt of our product this policy becomes void Check our LIMITED WARRANTY if product quality lessens over time Shor Line s obligation is limited to providing the applicable cre...

Страница 14: ...ions relating to repairs 2 Refer to PRODUCT RETURN POLICY if a product needs to be shipped to Shor Line IV PRODUCT REPAIR POLICY continued 3 If merchandise is damaged during shipping but can be repair...

Страница 15: ...ation by having driver sign all copies of the delivery receipt Accept the shipment retain copy of delivery receipt and continue to next page B AFTER ACCEPTANCE OF FREIGHT 2 INSPECT CONTAINERS FOR DAMA...

Страница 16: ...Perform this inspection even if merchandise won t be used right away C SUPPORT DURING SITE INSPECTION 1 A third party freight inspector will inspect freight containers merchandise and inner packing ma...

Страница 17: ...y statement Shor Line s liability under the limited warranty shall be limited as provided for above and the foregoing shall be the customer s sole remedy and recourse under this contract There are no...

Страница 18: ...1579 or 913 281 1500 Fax 913 281 5339 Web www shor line com E Mail contact shor line com SHOR LINE LIMITED Vale Business Park Llandow Cowbridge Vale of Glamorgan CF71 7PF Wales United Kingdom Phone 4...

Отзывы: