background image

09

 

Before you start... 

Things to check before you start:

 

 

Check all parts as listed in the parts lists. 

 

Read the instructions fully before starting work. 

 

Follow all the health and safety guidelines. 

 

Ensure your base is ready – See page 4. 

You will need:

 

 



Hammer 

 

 



Spirit level 

 



Ladder 

 

 

 



1mm 3mm 5mm 8mm    
drill bit 

 

 



Drill

 

 

 

 

 



Tape measure & Ruler

 

 

  

 



Sand paper                         

 

 



Gloves 

 

 

 



Saw

 

 

 

 



Pencil 

 

 

 



Goggles

  

 

 

 

 



A helper for some

 

 tasks

 

 

 



 Screwdriver   

 

 

 



 Sharp knife

 

 

 



Masking tape      

 

 

When you see the drill icon 

Only ever drill through the first 

piece of framework which will be a 

pilot hole for the screw to attach the 

second piece of framework 

The required drill bit size is 

shown with the icon. 

5mm  

In more detail

….. 

GB 

IE 

Содержание Highclere

Страница 1: ...Version 02 11 09 2020 Sasha Leney These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE 8x6 Highclere Mass 254 4 kg...

Страница 2: ...j zyku prosimy o wys anie maila lub pisa na adres podany poni ej RUS TR Ba ka bir dilde talimatlar veya bir kopyas n bir kopyas i in bir e posta g nderebilir veya a a daki adrese yaz n z EN For a cop...

Страница 3: ...mbly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY...

Страница 4: ...d re sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warping Splitting Preparation of base We recommend that the base onto which...

Страница 5: ...The 6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level...

Страница 6: ...Stacked Parts List Description part No Qty 06...

Страница 7: ...07 Fascia and Nail Bag Parts List Description part No Qty...

Страница 8: ...Chart Scale 1 1 A0023 x226 13mm Felt Nail A0025 x28 40mm Round head nail A0032 x08 25mm Posi drive screw A0035 x58 60mm Posi drive screw Nail bag contents 13mm Description part No Qty A0024 x90 16mm...

Страница 9: ...You will need Hammer Spirit level Ladder 1mm 3mm 5mm 8mm drill bit Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you s...

Страница 10: ...10 In more detail GB IE...

Страница 11: ...In more detail GB IE 11...

Страница 12: ...he 8 Plain Panel Door and Window Panel FIT INSIDE THE RH LH Window Panels The Panel Layout is showing you how the Door and Window Panels can be swapped Floor Panel A5652 x01 Carefully put the Floor Pa...

Страница 13: ...g a drill or electric screwdriver carefully but firmly push the opposite end to the screwdriver bit into the screw head and keep the pressure on to prevent the screwdriver spinning in the screw Drill...

Страница 14: ...e floor bearers Place the LH Window Pent onto the floor into the corner and push the Plain Panel up to it and fix with 60mm Screws A0035 03 DO NOT FIX WALLS TO FLOOR UNTIL ASKED Inline with floor bear...

Страница 15: ...s are inline with the floor bearers Fix with 60mm Screws A0035 using the pilot holes drilled in the previous step 04 5mm Inline with floor bearer DO NOT FIX WALLS TO FLOOR UNTIL ASKED NOTE Some holes...

Страница 16: ...ake sure you don t drill through the doors Place the panel onto the edge of the floor and fix with 3x 60mm Screws A0035 05 5mm DO NOT FIX WALLS TO FLOOR UNTIL ASKED Double Door Panel A5644 x01 60mm Sc...

Страница 17: ...drilled at an angle as the drill will not fit in between the bars Fix the panel with 6x 60mm Screws A0035 using the holes drilled previously 06 5mm Window Panel A5645 x01 60mm Screws A0035 x06 NOTE S...

Страница 18: ...can be secured into the walls Flip over and drill two holes along the edge that sits against the front Door and Window Panels Then fix with 60mm Screws A0035 On the inside secure the panel to the fro...

Страница 19: ...that sits along the front Door and Window Panel Drill three holes along the side that joins the two panels together Fix with 60mm Screws A0035 as below On the inside screw the roof panels together us...

Страница 20: ...e second view shows which end the drills should be placed Make sure the holes are drilled so that the screws go into the walls and that the Soffit is secured to the building Fix with 60mm Screws A0035...

Страница 21: ...eps 60mm Screws A0035 x10 GB IE Fix the Coverstrips 12x46x1837 A3986 to the back of your building as below Fix the Coverstrip 12x46x2086 A5649 to the front of your building as below Fix with 4x 40mm N...

Страница 22: ...rst and second piece of felt as shown below making sure there is an even overhang front and back Pull the Felt tight and secure with 13mm Felt Nails A0023 approximately 100mm apart 12 22 2 7M Felt Str...

Страница 23: ...A4445 to the front of the building Then fit the Fascia 19x145x470 A5650 and Fascia 19x145x1941 A4446 to the sides using 40mm Nails A0025 GB IE 13 GB IE 14 Tidying the corner 2 7M Felt Strip A2555 x01...

Страница 24: ...lds the acrylic fit the Beading 1538 A0073 with 6 pins and the Beading 550 A0075 with 3 pins in front WEAR THE CORRECT SAFETY EQUIPMENT DANGER OF CUTTING HANDLE WITH CARE Beading 550 A0075 x10 Beading...

Отзывы: