background image

1

  Check and ensure that no raised grain or 

splinters are evident on timber components.
Sand down any raised grain or splinters 
using fine grade sandpaper.

2

  Check that all screw, nail and pin heads are 

properly tapped home and are not proud of
the timber surface.

3

  Check and ensure that no screws, nails or 

pins protrude through any panel.

4

  Check and ensure that all parts are properly 

secured against reasonable force.

5

  Do not apply decorative wood 

finish/treatments to wet or damp timber.
Please observe the instructions of the wood 
finish/treatment manufacturer.

Assembly Completion Checklist

Assembly of Building - 

PLEASE READ INSTRUCTIONS PRIOR TO ASSEMBLY

F

 - 

Finishing Touches

E

 - 

Hang Doors

D

 - 

Coverstrips

A

 - 

Floor & Walls

1 Place down floor ‘A’ on a flat level 

surface.

2 Place one back panel ‘B’ with a side 

panel ‘C’. Note: the back panels and 
the front assembly are to go inside
the side panels and that the 
overhang on the panels sit over the 
edge of the floor. Drill then screw 
together using 2 x 60mm screws.

Do not fix to the floor until all the 
walls are in position.

3 Fix the other back 

B

 to the first

back again using 2 x 60mm screws. 

4 Fix the other side panel C to the

other end again using 2 x 60mm 
screws.

5 Position one of the part 

framework between the the side 
panels at the top ensuring they 
are level and and flush with the 
framework and fix with an angle 
bracket and 2 x 25mm screws at 
each end. 

6 Repeat step 5 with the other 

framework but at the bottom 
making sure it is flush with the front 
of the floor.

B

 - 

Door Assembly

1 Lay down door 

panel ‘D’ onto
the floor, shiplap 
facing up. The 
top of the panel 
is the one 
without the 
overhanging 
shiplap.

2 The diagonal

door bracing on 
the inside points 
towards the
door opening. 
The hinges are 
to be placed on 
the boarding, 
which covers 
each horizontal 
door backing.

1 Space the doors from the top of the 

door panel framework approx. 8mm. 

2 Fix the moveable part of each hinge 

to the cover strips of the side panels 
‘C’ using 3 x 25mm screws per
hinge.

3 Place the

pointed part
of the hinges
onto the
doors with the
round
moveable part
overhanging
the edge. Fix
the pointed part in place using 
4x 25mm screws per hinge.

Inside of door - for
positions in relation
to bearers. 

DO NOT

FIT HINGES &
LOCKS ON INSIDE

C

 - 

Fit Roof & Felt

1 Place OSB Roof panel ‘E’ onto the 

building. It should sit flush at the
back and sides but overhang a 
little at the front. Draw a line all 
around the inside of the roof.

2 Remove the roof and place on a flat 

surface. Take one of the roof fixing
blocks and place it centrally inside 
the line for the side panel. Draw a 
line the other side and at each end. 

3 Drill through the roof panel centrally 

between the lines at both ends. Fix
the block with 2 x 25mm screws 
from the other side. Repeat at the 
other end and in two places along 
the back and then the front.

4 FELTING –

place the
piece of felt
on a smooth
surface so
not to
damage it,
place the roof panel on the top so 
the blocks are facing upwards. Fold 
the felt over the roof panel (trim if 
necessary) and fix at approximately 
100 mm spacing with felt nails.

5 Place the roof into position and drill

then fix through the blocks with one 
60mm screw per block.

1 Fit two bolts to

the inside, inner
edge of the left
door 'E'.  The
top bolt should
be positioned
so that the solid
part of the bolt
finishes flush
with the top of
the door.  Fit
using 4x 10 mm
screws.  Hold
the door tightly
closed.  Move
the moveable
part of the bolt
and mark where
this meets the door frame.  Drill 
a small hole using an
8 mm drill bit.

3 Place the

padbolt in
position on the
outside of the
right hand door
'D' directly over
the central
horizontal brace.  Ensure the 
edge is flush with the upright 
edge. Secure using 4x 25 mm 
screws using the round holes only.

2 The bottom

bolt should fit 
flush with the 
bottom edge of 
the door.  Fit
as for top bolt.

4 Place padbolt

housing in
position to
accommodate
the padbolt.
Secure using
2x 25 mm screws using the round 
holes only.

5 Place outside door cover strip 'D2'

flush with the top and bottom of 
the door and mark top and bottom 
of padbolt position.

6 Attach the door stop strips above 

and below the padbolt.  Half of each 
strip should overhang the edge of 
door 'D' and when closed also 
overhang the left hand door 'E'. 
Secure using 6x 25 mm screws.

1 Screw all side panels to the floor on 

the inside of the building using 1 x
60mm screw per separate panel. 

7 Fix weather

strips ‘I’ flush to 
the inside edge 
of the sides of 
the door 
aperture. Fix 
using 4 x 40mm 
nails per strip.

1 Fix the cover strips 

in position where 
the panels meet. 
There will be three 
slightly longer cover 
strips, these are for 
the back. Secure 
strips using 4x 
40mm nails each.

Cut out 
section as 
marked

G

 - 

Secure Walls to Floor

Отзывы: