1
Check and ensure that no raised grain or
splinters are evident on timber components.
Sand down any raised grain or splinters
using fine grade sandpaper.
2
Check that all screw, nail and pin heads are
properly tapped home and are not proud of
the timber surface.
3
Check and ensure that no screws, nails or
pins protrude through any panel.
4
Check and ensure that all parts are properly
secured against reasonable force.
5
Do not apply decorative wood
finish/treatments to wet or damp timber.
Please observe the instructions of the wood
finish/treatment manufacturer.
Assembly Completion Checklist
Assembly of Building -
PLEASE READ INSTRUCTIONS PRIOR TO ASSEMBLY
F
-
Finishing Touches
E
-
Hang Doors
D
-
Coverstrips
A
-
Floor & Walls
1 Place down floor ‘A’ on a flat level
surface.
2 Place one back panel ‘B’ with a side
panel ‘C’. Note: the back panels and
the front assembly are to go inside
the side panels and that the
overhang on the panels sit over the
edge of the floor. Drill then screw
together using 2 x 60mm screws.
Do not fix to the floor until all the
walls are in position.
3 Fix the other back
B
to the first
back again using 2 x 60mm screws.
4 Fix the other side panel C to the
other end again using 2 x 60mm
screws.
5 Position one of the part
D
framework between the the side
panels at the top ensuring they
are level and and flush with the
framework and fix with an angle
bracket and 2 x 25mm screws at
each end.
6 Repeat step 5 with the other
D
framework but at the bottom
making sure it is flush with the front
of the floor.
B
-
Door Assembly
1 Lay down door
panel ‘D’ onto
the floor, shiplap
facing up. The
top of the panel
is the one
without the
overhanging
shiplap.
2 The diagonal
door bracing on
the inside points
towards the
door opening.
The hinges are
to be placed on
the boarding,
which covers
each horizontal
door backing.
1 Space the doors from the top of the
door panel framework approx. 8mm.
2 Fix the moveable part of each hinge
to the cover strips of the side panels
‘C’ using 3 x 25mm screws per
hinge.
3 Place the
pointed part
of the hinges
onto the
doors with the
round
moveable part
overhanging
the edge. Fix
the pointed part in place using
4x 25mm screws per hinge.
Inside of door - for
positions in relation
to bearers.
DO NOT
FIT HINGES &
LOCKS ON INSIDE
C
-
Fit Roof & Felt
1 Place OSB Roof panel ‘E’ onto the
building. It should sit flush at the
back and sides but overhang a
little at the front. Draw a line all
around the inside of the roof.
2 Remove the roof and place on a flat
surface. Take one of the roof fixing
blocks and place it centrally inside
the line for the side panel. Draw a
line the other side and at each end.
3 Drill through the roof panel centrally
between the lines at both ends. Fix
the block with 2 x 25mm screws
from the other side. Repeat at the
other end and in two places along
the back and then the front.
4 FELTING –
place the
piece of felt
on a smooth
surface so
not to
damage it,
place the roof panel on the top so
the blocks are facing upwards. Fold
the felt over the roof panel (trim if
necessary) and fix at approximately
100 mm spacing with felt nails.
5 Place the roof into position and drill
then fix through the blocks with one
60mm screw per block.
1 Fit two bolts to
the inside, inner
edge of the left
door 'E'. The
top bolt should
be positioned
so that the solid
part of the bolt
finishes flush
with the top of
the door. Fit
using 4x 10 mm
screws. Hold
the door tightly
closed. Move
the moveable
part of the bolt
and mark where
this meets the door frame. Drill
a small hole using an
8 mm drill bit.
3 Place the
padbolt in
position on the
outside of the
right hand door
'D' directly over
the central
horizontal brace. Ensure the
edge is flush with the upright
edge. Secure using 4x 25 mm
screws using the round holes only.
2 The bottom
bolt should fit
flush with the
bottom edge of
the door. Fit
as for top bolt.
4 Place padbolt
housing in
position to
accommodate
the padbolt.
Secure using
2x 25 mm screws using the round
holes only.
5 Place outside door cover strip 'D2'
flush with the top and bottom of
the door and mark top and bottom
of padbolt position.
6 Attach the door stop strips above
and below the padbolt. Half of each
strip should overhang the edge of
door 'D' and when closed also
overhang the left hand door 'E'.
Secure using 6x 25 mm screws.
1 Screw all side panels to the floor on
the inside of the building using 1 x
60mm screw per separate panel.
7 Fix weather
strips ‘I’ flush to
the inside edge
of the sides of
the door
aperture. Fix
using 4 x 40mm
nails per strip.
1 Fix the cover strips
in position where
the panels meet.
There will be three
slightly longer cover
strips, these are for
the back. Secure
strips using 4x
40mm nails each.
Cut out
section as
marked
G
-
Secure Walls to Floor