background image

 Shiplap Tool Store

 Small Handy Store

 

Thank you and congratulations on the purchase of your Shire garden building. We 
believe that this product will give you many years of excellent service. This is a 
natural product manufactured to a high standard therefore if you have any queries 
or experience any difficulties then please contact our customer service hotline on 

01945 4

65 295

Normal office hours: 8.30 am to 5.00 pm Monday to Friday. 

       

Preparation of base 

We recommend that the base onto which your building will stand should be at least 
75mm larger in each direction than the total floor size of the building. 
Actual floor area of the building: 868x560 (2’10x 1’10) 
Total height clearance: 1914mm 
The chosen position in your garden for the siting of the building should be       
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs 
can be evenly laid - 

THEY MUST BE LEVEL AND FIRM.

 

Treatment/care of your Garden Building 

Treat with a suitable decorative wood finish immediately. We recommend that all 
timber pieces be treated again prior to assembly and again within 3 months of  
assembly. We further recommend that all pieces are treated again at least annually 
or as frequently as the instructions on the product used recommends. 
We would suggest that all wall panels be treated in an upside-down position to 
allow the finish/treatment to ingress into the tongue and groove jointing. 

Garden buildings are not waterproof, therefore on assembling building we 
recommend using a silicon based sealant between wall panels and between 
wall panels and floor. 

 

Hammer

 

Sand paper

 

Battery-powered drill/screwdriver

 

Pencil

 

Tape measure

 

Gloves

 

Sharp knife

         

IMPORTANT! 

PLEASE READ PRIOR TO ASSEMBLY OF 
THE BUILDING 

EVERY PRECAUTION IS TAKEN TO 
ENSURE THAT YOUR BUILDING HAS NO 
ELEMENT INCORRECTLY PLACED OR 
POSSIBLY HAZARDOUS, HOWEVER 
PRIOR TO USE PLEASE CHECK ALL 
SURFACES FOR THE FOLLOWING: 
1 RAISED GRAIN, SPLINTERS: sand 
down timber to smooth finish 
2 NAIL/SCREW/PIN HEADS PROUD: tap 
home to be flush with surface of timber 
3 DAMAGED SCREW HEADS 
RESULTING IN SHARP SPLINTERS OF 
METAL: replace 
4 SHARP ENDS OF NAILS/ SCREWS/ 
PINS PROTRUDING THROUGH THE 
PANEL: remove and reposition. 
5 ENSURE ALL PARTS ARE SECURED 
AGAINST REASONABLE FORCE: 
remove and refit 
6 ENSURE THERE ARE NO LOOSE 
PARTS: remove and refit/discard 

We recommend that protective 
gloves be worn throughout

 

Wood is a natural product and is therefore 
prone to changes in appearance, including 
some warping, movement and splitting, 
particularly during unusual climatic conditions 
(long hot or wet spells of weather). As a natural 
occurrence this is not covered by a guarantee. 

     

PLEASE NOTE

 

2/02/10 

   

TOOLS REQUIRED 

QTY    DESCRIPTION 

4  

  Cover strips 46x12x1500  

4  

  Fascia 46x12x670mm 

1   

 Door stop strip 28x12x490 

1  

  Diamond 

22     60 mm screws 
27     25 mm screws 
26     40 mm nails 
53     Felt nails 
16     Felt nails - long 

1  

  Felt roll 2m x 1m 

1       Pad bolt fixing block  

   34x34x150mm 

1       Pad bolt 
3  

  Door ‘T’ hinges 

PLEASE LAY OUT PARTS AND CHECK OFF AGAINST CHECK LIST 

Parts List 

SIDE PANEL

560

583

QTY 2

ROOF PANEL

1482

BACK PANEL

800

QTY 2

892

GABLE  QTY 2

370

1482

1500

1482

495

DOOR

WING

PANEL

310

560

600

868

FLOOR

EXTERNAL 
VIEW OF 
PANELS 

Batch No.3930

Отзывы: