Put clean resin tank into the position. Lock the buckles for
As the following picture shows, installation is completed.
Add Material
First Print
7)
8)
11
(There are four positioning slots)
resin tank.
Note that the resin level
of minimum and maximum.
Note: You can also add resin during printing without pausing.
Please refer to the “AccuFab-L4D Quick Start Guide” in the flash drive. The flash drive can be used for data transmission later on.
10
should be between the indicator lines
Shake for 2 mins before pouring material into the resin tank to
avoid sediment.
10
11
Содержание AccuFab L4D
Страница 1: ...AccuFab L4D Installation Guide 3D Printer ...
Страница 5: ......
Страница 6: ...Technical resource S Document Download Center upport Center Aftersales service ...