8(42)
cutting the refrigerant immediately after downtime.
Refrigerant indicator can be opted to detect the refrigerant and ensure its
quality and water ratio.
Optional flow switches to detect the chilled water flow.
All service work should be carried out by a person with technical training or
corresponding professional experience. The manual contains instructions for both
handling and servicing. Chapter 6, which contains service instructions intended for
service engineers. Other chapters contain instructions for the daily operator.
Any modifications of the machine must be approved by SHINI in order to avoid
personal injury and damage to machine. We shall not be liable for any damage
caused by unauthorized change of the machine.
Our company provides excellent after-sales service. Should you have any problem
during using the machine, please contact the company or the local vendor.
Shini Hotline Service:
Headquarter and Taipei factory
:
Tel: + 886 (0)2 2680 9119
Shini Plastics Technologies (Dongguan), Inc.
:
Tel: +86 (0)769 8331 3588
Shini Plastics Technologies (Pinghu), Inc.
:
Tel: +86 (0)573 8522 5288
Shinden Precision Machinery (Chongqing), Inc.:
+86 (0)23 6431 0898
Содержание SIC-10W
Страница 1: ...SIC W Water cooled Water Chillers Date Mar 2022 Version Ver D English ...
Страница 2: ......
Страница 35: ...35 42 6 Repair and Maintenance ...
Страница 36: ...36 42 ...