ShinewayTech NCT-500 Скачать руководство пользователя страница 13

 

 

Wiremap 

The test needs to work with WM-10remote adaptor. (Use the 

Right

 port) 

The results can be saved after test

 

 

Exp 

PING 

The test is used for exam the connectivity from NCT-500 to an IP nod. (Use the 

Left 

port) 

ICMP data packet can be manual setting. n 
Before you start test you need to set local IP address. (System setting —> Local IP) 
If DHCP server is available, you can also get local IP address by using DHCP setting. (System setting —> 
Local IP) 
The program can indicate max and minimum time, average time and data packet lost value as a chart.   
Y axis indicate data packet delay (ms), X axis indicate the data packet value of sending.   
 

   

                                                                             

          Exp 

Setting: 

Dest.IP

the target IP address 

Pkt Size

sending ICMP data packet size , configure 12-1492 bytes, default 32 

Содержание NCT-500

Страница 1: ...NCT 500 Network Cable Tester User s Manual Shineway Technologies Inc...

Страница 2: ...fast validate connectivity and reliability of Ethernet cable and networks Please read this manual carefully Please access the company website to get the latest electronic manual Package list NCT 500 n...

Страница 3: ...e use slight wet cotton to clean the product DO not use acid alkali solution Battery and Charging NCT 500 tester use Li ion batteries the batteries must be take out when tester will not be used in a l...

Страница 4: ...scovery and indicate equipment info and neighbor info through LLDP LEEE CDP Cisco such as device name software version VLAN info Ports info etc PoE port voltage level and of power and Ethernet power s...

Страница 5: ...ware to make status report and reports can be printed Reportview client software and the introduction can download from NCT 500 USB storage card and you can also get the latest version on the company...

Страница 6: ...E 10M 100M 1000M ACT and DUP Charging indicator Red battery charging Green charging complete Button Three functional buttons are set test save and back correspond with LCD screen s menu Direction keys...

Страница 7: ...e test results Results saving Cable test Network test and Wiremap test can be saved ID number need to be input when you save the results When you test a cable with all three kind of test ID number sho...

Страница 8: ...xp Cable status Open disconnected or break off Short pair s short Online correct connection Fail un identified cable or is malfunction Hint the device could not get cable length when cable pair is onl...

Страница 9: ...that network transmission signal will produce reflection and damping And it will affect network transmission accessibility One end of tested cable need to plug in NL 830 s left port and the other end...

Страница 10: ...test Need to connect to RT 80 data reflector Impendence test Need to connect to RT 80 data reflector and RT 80 do not need to turn on Hint NCT 500 could not display cable length when connecting to the...

Страница 11: ...power voltage power pairs and PD model The nonstandard PSE device could also be tested but PoE LED indicator will not be lighted Exp Discovery The test is used for getting network equipment s basic in...

Страница 12: ...d URL HTTP page connecting HTTP page accessing can indicate web server status code info Exp Internet Test setting 1 PD power simulation set the simulation power level of NL 830 default IEEE802 3af 12...

Страница 13: ...st you need to set local IP address System setting Local IP If DHCP server is available you can also get local IP address by using DHCP setting System setting Local IP The program can indicate max and...

Страница 14: ...Right port Port Flashing The test is used for identity the target switch port or cable Use the Left port After connecting NL 830 to a network equipment turn on the program the equipment port LED indi...

Страница 15: ...one Turn on off tone System info Indicate device info and local MAC address Memory card manage Delete Files is used for delete all test report documents file s data this instruction could not be rever...

Страница 16: ...B port 5V 1 5A Max Battery Li Lon battery 3 7V 2500maH Charging time 2 3 hrs Woring time 4 6 hrs Properties Description Display 2 2 TFT LCD 220x176 pixels LED seven Buttons nine Storage Micro SD 4G ma...

Отзывы: