INTRODUCTION
3 / 32
INTRODUCTION
This operating manual contains instructions for operating E-TUBE PROJECT.
In order to fully utilize the functions of E-TUBE PROJECT, please read this manual thoroughly before
use.
Note
Once a connection check is started, never connect or disconnect the battery or unit before the
completion of the operation or E-TUBE PROJECT. If this is not observed, it may damage the
SM-PCE1 / SM-BCR2 or the other units.
Never attempt to change the contents of the firmware files or the filenames. If you do this, it will
not be possible to update the firmware correctly, and problems may occur with the units after
carrying out firmware updates.
NOTE
When connecting the SM-PCE1 / SM-BCR2 to the PC, connect it directly to the USB port of the PC,
without using an intermediate device such as a USB hub.
Make sure that the PC does not switch into standby while you are carrying out operations such as
updating the firmware.
If the PC switches to standby, E-TUBE PROJECT processing will be interrupted and the screen
display will return to the main menu screen.