background image

PCE2

PCE2

PCC2

PCC2

PCE2

PCE2

PCC2

PCC2

SS

Step 5

 Stick the sealing strips (

SS

) to the rafters and line up the 

PCE2

 panels with

the outside of the shelter then equally space the 

PCC2

 panels in the gap.

Apply more sealing strips on the top of the roof panels directly above the 

strips on the rafters.

8

Содержание SR1606

Страница 1: ...Assembly Instructions Shelter type SR1606 SR1606 01 270116 UK Email Sales shelters4less co uk Web www shelters4less co uk Tel 0800 160 1002 ...

Страница 2: ... 5 6 9 4 14 13 11 2 3 2 Fittings Bolt set M10 Nut Washer Black Cap T25 T50 AB1210 M10 x 60 mm 25mm Tech screw 50mm Tech screw M10 x 100mm Concrete Bolt Pack A B 40 40 80 80 136 66 13 Required 40 40 80 80 76 55 8 Spare 0 0 0 0 60 11 5 Image ...

Страница 3: ...R4 RAFTER 2160 x 40 x 40 4 8 R5 RAFTER 2160 x 40 x 40 1 9 ST4 ROOF TIE 2080 x 40 x 40 2 10 JF3 BRACKET 210 x 40 x 40 1 11 P4 POST 1995 x 40 x 40 1 12 L1 L BRACKET 95 x 45 8 13 FT1 FOOT BRACKET 109 x 100 x 40 3 14 FT3 FOOT BRACKET 109 x 100 x 80 5 15 SS SEALING STRIP TRIM TO 2205 4 16 PCE1 ROOF PANEL 2205 x 1050 2 17 PCC2 ROOF PANEL 2205 x 1030 2 18 RC1 ROOF STRIP 2205 x 60 5 19 2MD ROOF TRIM TRIM ...

Страница 4: ... roof panels only CHECK DIMENSIONS TO ENSURE CORRECT ALIGNMENT CF1 JF1 S1 Ensure correct alignment on corners CB1 CB1 Step 1 Assemble S1 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the straight joints 4 ...

Страница 5: ... 1 9 S1 STUB JF2 CB1 JF1 DETAIL B SCALE 1 6 JF1 S1 STUB CB1 JF2 Step 2 Attach the S1 stubs to the front of the frame using CB1 JF1 and JF3 brackets then bolt the R4 and R5 rafters into place using the RB1 brackets and the stubs 5 ...

Страница 6: ...1 ST4 P4 JF3 DETAIL C SCALE 1 4 JF3 ON FRONT RB1 BELOW Step 3 Assemble the T section by joining the two ST4 tie bars using a JF3 bracket then join the P4 post using two RB1 brackets and attach a L1 bracket to each end 6 ...

Страница 7: ...T section to the shelter then fix the R4 rafters in place using more RB1 brackets on the rear and L1 brackets on the front Bolt the FT1 and F3 brackets to the shelter and move it to its final position before using anchor bolts to secure it to the ground 7 ...

Страница 8: ...5 Stick the sealing strips SS to the rafters and line up the PCE2 panels with the outside of the shelter then equally space the PCC2 panels in the gap Apply more sealing strips on the top of the roof panels directly above the strips on the rafters 8 ...

Страница 9: ...RC2 2MD RC2 2MD Step 6 Screw down the RC2 strips into the rafter with the 50mm tech screws to secure the roof panels and push the 2MD end caps on the bottom of the panels 9 ...

Страница 10: ...4 50 1035 1035 1035 1044 50 1088 40 1048 40 2070 2193 2187 4180 4263 TO FEET HOLES 10 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm oversized on all four sides ...

Страница 11: ...Notes 11 ...

Страница 12: ...rnemouth BH1 1SA MAINTENANCE To ensure your products give you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched All Parts and Fixings checked by Print Name Signature ...

Отзывы: