background image

PCE2

PCC2

PCE2

ss

Step 3

 Apply sealing strips 

(SS)

 to rafters. Align the two 

PCE2

 roof panels

               with the outer edges of the shelter, leaving a gap in between the

               panels.

6

Содержание SR1604

Страница 1: ...Assembly Instruction Shelter Type SR1604 SR1604 01 220116 UK Email Sales shelters4less com Web www shelters4less com Tel 0800 160 1002...

Страница 2: ...14 15 16 4 1 11 8 7 12 3 5 6 2 3 9 2 EXPLODED VIEW...

Страница 3: ...1035 4 2 CB1 CORNER BRACKET 110 x 110 4 3 JF1 BRACKET 220 x 40 2 4 RB1 BRACKET 110 x 46 8 5 S1 STUB STUB 140 x 40 x40 2 6 JF2 BRACKET 130 x 30 4 7 FT1 FOOT BRACKET 109 x 100 x 40 2 8 FT3 FOOT BRACKET...

Страница 4: ...frames to make up the main structure using CB1 brackets in the corners and JF1 brackets for the straight joints JF1 CB1 S1 CB1 CB1 Ensure corners are aligned correctly TOP VIEW 4 Check shelter dimens...

Страница 5: ...2 Move the shelter in to its final position make sure it is square and attach FT1 and FT3 foot brackets which screw into the ground with the concrete bolts Attach JF2 brackets to S1 Stubs Using CB1 an...

Страница 6: ...PCE2 PCC2 PCE2 ss Step 3 Apply sealing strips SS to rafters Align the two PCE2 roof panels with the outer edges of the shelter leaving a gap in between the panels 6...

Страница 7: ...Use RC2 strips to cover the gap in the centre and the edges and screw them directly into the frame using 50mm TEC screws Finish of the shelter by attaching the 2MD edge trim then finally fit the Black...

Страница 8: ...995 945 50 1035 945 50 1980 50 TO FOOT HOLE CENTRES 2110 2187 Plan View Suggested size for concrete base 200mm oversized on all four sides 8...

Страница 9: ...Notes 9...

Страница 10: ...Notes 10...

Страница 11: ...Notes 11...

Страница 12: ...BH1 1SA MAINTENANCE To ensure your products give you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tigh...

Отзывы:

Похожие инструкции для SR1604